Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Approach Road (Road Connectivity) Towards Phc Kiru Under Ladp Of Kiru Hepp (Rr Plan).
|
| Description |
Refer To Boq
|
| Organisation | PWD | CE RandB Pir Chenab | SE RandB Doda-Kishtwar | EE RandB Paddar |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 600 |
| EMD | 77660 |
| Tender Value | 38.83 Lakh |
| Place | Jammu and Kashmir |
| Link | Login to view |
| Start Date | October 14, 2026 17:30 |
| End Date |
Open
23/10/2026
7 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing consultancy of structural and architectural design for establishment of fish farming project as mitigating measures for fish and fisheries bio diversity unde hydro electric project of kiru part under emp of kiru hepp
Refer to boq
Read moreConst of internal approach path, drainage crossings and associated access infrastructure for providing safe and all-weather connectivity and pedestrian connectivity to the 400kvs/s resid colony, kashipur, integration with the existing drainage system
Const of internal approach path, drainage crossings and associated access infrastructure for providing safe and all-weather connectivity and pedestrian connectivity to the 400kvs/s resid colony, kashipur, integration with the existing drainage system
Read moreDevelopment and approach path towards crematorium at guleria mohalla from culvert near sewerage treatment plant at ward no.08 of dmc.
Development and approach path towards crematorium at guleria mohalla from culvert near sewerage treatment plant at ward no.08 of dmc.
Read moreRe-conditioning of existing natural pathway with drain along with main approach road connecting towards udayagiri i and udayagiri ii, dist - jajpur
Re-conditioning of existing natural pathway with drain along with main approach road connecting towards udayagiri i and udayagiri ii, dist - jajpur
Read moreConstruction of approach road from newly constructed awc towards janardan mondals house at pathra of nagari gp under suri-i dev. block
Construction of approach road from newly constructed awc towards janardan mondals house at pathra of nagari gp under suri-i dev. block
Read moreConstruction of pqc road, drains, shoulders for approach road from kaiga 1 to 4 main gate towards kaiga 5 and 6 main gate, kaiga site.
Construction of pqc road, drains, shoulders for approach road from kaiga 1 to 4 main gate towards kaiga 5 and 6 main gate, kaiga site.
Read moreGeneral sabarimala festival 2025 26 improvements to vendar gwlps thachanmukk road including approach road towards kanjiramvila junction by providing bm and bc general civil work
General sabarimala festival 2025 26 improvements to vendar gwlps thachanmukk road including approach road towards kanjiramvila junction by providing bm and bc general civil work
Read moreConst of internal approach path, drains for providing all-weather vehicular, pedestrian connectivity to the control room building and associated electrical infrastructure at 132kv s/s, almora, including provisions for safe movement of oandm personnel
Const of internal approach path, drains for providing all-weather vehicular, pedestrian connectivity to the control room building and associated electrical infrastructure at 132kv s/s, almora, including provisions for safe movement of oandm personnel
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreof your Industry type