Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening Of Coal Transportation Road By Clearing Of Ob On Turning Of Jk Tail End Area At Gevra Project Of Gevra Area.
|
| Description |
Widening Of Coal Transportation Road By Clearing Of Ob On Turning Of Jk Tail End Area At Gevra Project Of Gevra Area.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_SECL_281743_1 |
|
Reference Number |
SECL/GA/GM(C)/ETN/23-24/42 dt 16.06.2023 |
| Tender Fee | - |
| EMD | 2.48 Lakh |
| Tender Value | - |
| Place | Office of the GM(Civil), SECL, Gevra Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | June 21, 2023 16:30 |
| End Date |
Expired
06/07/2023
Expired 1196 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Threading inserts external 2mm,threading inserts internal 2mm,threading inserts external 3mm,threading inserts internal 3mm,turning inserts ccgt 120408,turning inserts dcmt 150404,turning inserts dcmt 150408,turning inserts dnmg 110404,milling insert r390 11t3 10m,milling insert r390 11t3 08m,milling insert r390 11t3 04e,milling insert r390 11 t3 04m,milling insert r390 11 t3 10m,turning insert snmg 120408,turning insert vbmt 160404,milling insert xdct 110412,milling insert xdpt 110408,milling insert xdpt 110412,carbide end mill cutter 6mm,carbide end mill cutter 8mm,carbide end mill cutter 10mm,carbide end mill cutter 12mm,hss end mill cutter 6mm,hss end mill cutter 8mm,hss end mill cutter 10mm,hss end mill cutter 12mm,rough end mill 12mm,rough end mill 16mm,rough end mill 20mm,edge finder 10mm,slotted angle plate,er collet chuck er40,turning vgct 160404,brazed carbide tools turning tool right hand p30,brazed carbide tools right hand turning tool k20,brazed carbide tools turning tool left hand p30,bra
Threading inserts external 2mm,threading inserts internal 2mm,threading inserts external 3mm,threading inserts internal 3mm,turning inserts ccgt 120408,turning inserts dcmt 150404,turning inserts dcmt 150408,turning inserts dnmg 110404,milling insert r390 11t3 10m,milling insert r390 11t3 08m,milling insert r390 11t3 04e,milling insert r390 11 t3 04m,milling insert r390 11 t3 10m,turning insert snmg 120408,turning insert vbmt 160404,milling insert xdct 110412,milling insert xdpt 110408,milling insert xdpt 110412,carbide end mill cutter 6mm,carbide end mill cutter 8mm,carbide end mill cutter 10mm,carbide end mill cutter 12mm,hss end mill cutter 6mm,hss end mill cutter 8mm,hss end mill cutter 10mm,hss end mill cutter 12mm,rough end mill 12mm,rough end mill 16mm,rough end mill 20mm,edge finder 10mm,slotted angle plate,er collet chuck er40,turning vgct 160404,brazed carbide tools turning tool right hand p30,brazed carbide tools right hand turning tool k20,brazed carbide tools turning tool left hand p30,bra
Read moreRepair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Read moreHandling ,transport and other mining services - percentage quote based - ob removal, coal extraction, handling & transport service, hiring of hemm for ob removal coal extraction loading transportation mobile crusher, chhal ocp raigarh area
Handling ,transport and other mining services - percentage quote based - ob removal, coal extraction, handling & transport service, hiring of hemm for ob removal coal extraction loading transportation mobile crusher, chhal ocp raigarh area
Read more09- road renovation work on the kandhla distributary (tail-end reach) from km 0.000 to km 1.500.
09- road renovation work on the kandhla distributary (tail-end reach) from km 0.000 to km 1.500.
Read moreRemoval of encrochements at the tail-end point of vembar river in kadaladi taluk of ramanathapuram district
Removal of encrochements at the tail-end point of vembar river in kadaladi taluk of ramanathapuram district
Read moreHandling ,transport and other mining services - percentage quote based - handling & transport service, ob removal, coal extraction, hiring of hemm for removal ob and extraction and transportation of coal from proposed os patch 8 to surface stock, ke..
Handling ,transport and other mining services - percentage quote based - handling & transport service, ob removal, coal extraction, hiring of hemm for removal ob and extraction and transportation of coal from proposed os patch 8 to surface stock, ke..
Read moreRestoration of d-2 channel of lis bathera of mrc from rd 0-85m and 600m to tail end.
Restoration of d-2 channel of lis bathera of mrc from rd 0-85m and 600m to tail end.
Read moreMaintaining the tail end distributory of mettur west bank canal for the period from november 2026 to february 2027
Maintaining the tail end distributory of mettur west bank canal for the period from november 2026 to february 2027
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreSelection of agency for door-to-door collection, transportation and treatment of segregated solid waste in budgam cluster of district budgam, ut of jk
Selection of agency for door-to-door collection, transportation and treatment of segregated solid waste in budgam cluster of district budgam, ut of jk
Read moreof your Industry type