Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Purchase, Demolishing And Disposal Of Existing Old Ho Building At Fatehgarh Under Fatehgarh Division Including Taking Away Of Serviceable/Unserviceable Material After Dismantling 2nd
|
| Description |
Purchase, Demolishing And Disposal Of Existing Old Ho Building At
Fatehgarh Under Fatehgarh Division Including Taking Away Of Serviceable/Unserviceable Material After Dismantling 2nd
Call
|
| Organisation | Department of Posts | Central Govt. Ministry/Department |
| Tender Id | 2025_DOP_847501_1 |
|
Reference Number |
22/IInd/EE/PCDA/2024-25 |
| Tender Fee | 0 |
| EMD | 3000 |
| Tender Value | - |
| Place | Old HO Building at Fatehgarh under Fatehgarh Dn |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=890904 |
| Start Date | February 04, 2025 20:30 |
| End Date |
Expired
13/02/2025
Expired 609 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read morePurchase, demolishing and disposal of existing old ho building atfatehpur under fatehpur division including taking away of serviceable/unserviceable material after dismantling
Purchase, demolishing and disposal of existing old ho building at
 fatehpur under fatehpur division including taking away of serviceable/unserviceable material after dismantling
Read moreDemolishing and disposal of existing head post office building at porbandar including taking away of serviceable/unserviceable material after dismantling
Demolishing and disposal of existing head post office building at porbandar including taking away of serviceable/unserviceable material after dismantling
Read morePurchase, demolition and disposal of dilapidated water tank at ajay nagar, postal colony, ajmer, including taking away of unserviceable serviceable material after dismantling.
Purchase, demolition and disposal of dilapidated water tank at ajay nagar, postal colony, ajmer, including taking away of unserviceable serviceable material after dismantling.
Read morePurchase demolition and disposal of dilapidated water tank at ajay nagar postal colony, ajmer, including taking away of unserviceable serviceable material after dismantling 2nd call.
Purchase demolition and disposal of dilapidated water tank at ajay nagar postal colony, ajmer, including taking away of unserviceable serviceable material after dismantling 2nd call.
Read morePurchase, demolishing and disposal of existing 04 nos old chawl type quarters at khadki post office campus pune including taking away of serviceable/unserviceable material afterdismantling. 2nd call
Purchase, demolishing and disposal of existing 04 nos old chawl type quarters at khadki post office campus pune including taking away of serviceable/unserviceable material after dismantling. 2nd call
Read morePurchase, demolishing and disposal of existing old ho building at banda under kanpur region including taking away of
Purchase, demolishing and disposal of existing old ho building at
 banda under kanpur region including taking away of
 serviceable/unserviceable material after dismantling-2nd call.
Read moreRecovery of serviceable / unserviceable material after dismantling of existing riicostore and cwr at office campus makrana
Recovery of serviceable/unserviceablematerial after dismantling of existing riicostore and cwr at office campus makrana
Read moreof your Industry type