Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Land Scheduling For Transmission System Tbcb
|
| Description |
Land Scheduling For Transmission System For Evacuation Of Power Frompotential Renewable Energy Zone In Khavda Area Of Gujarat Under Phase V (8 Gw): Part A
|
| Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 24332 |
|
Reference Number |
WR1/T/S-SRVY/DOM/F01/24/09591 |
| Tender Fee | 0 |
| EMD | 11000 |
| Tender Value | - |
| Place | Khavda-Nagpur HVDC line ( portion of the line under WR-I) |
| Link |
View Original Tender Notice
https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=d55ce5a1-b75b-479b-aefb-da4660589f9d |
| Start Date | July 16, 2024 15:20 |
| End Date |
Expired
18/07/2024
Expired 818 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design development implementation testing commissioning data migration and support of the open access scheduling and integrated settlement (oasis) system
Design development implementation testing commissioning data migration and support of the open access scheduling and integrated settlement (oasis) system
Read moreLand monetization
Least cost selection through limited tender among nlmc empanelled international property consultant firms
Read moreTd-562/26
Shifting of 132 kv sector 20 sector 45 sector20 sector 115 and sector-20 sector-66 transmission lines on nbmc towers and multi-circuit monopoles, including associated works at 220 kv sub-station, sector-20 noida
Read moreLeasing of dark fiber of opgw laid on upptcl eht lines for 5 years
Leasing of dark fibers of opgw laid on upptcl eht lines for five years, renewable twice for period of 5 years each with mutual consent.
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreNit for shifting/raising of 66 kv pasiana - sanour line within the land of m/s connaught place developers. (between tl. no. 250-252). (electrical and civil) deposit work
Nit for shifting/raising of 66 kv pasiana - sanour line within the land of m/s connaught place developers. (between tl. no. 250-252). (electrical and civil) deposit work
Read moreLiquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.
Liquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.
Read moreDesign,supply,delivery,installation and commissioning of 2 nos, of 10 kgs/hr and 3 nos, of 5 kgs/hr capacity vacuum feed type chlorination plants at chilkalguda reservoir premises in the newly constructed chlorine rooms, gopal nagar 2 ml elsr and chanda nagar 0.90 ml elsr along with two years maintenance under central chlorination cell-qat wing
Design,supply,delivery,installation and commissioning of 2 nos, of 10 kgs/hr and 3 nos, of 5 kgs/hr capacity vacuum feed type chlorination plants at chilkalguda reservoir premises in the newly constructed chlorine rooms, gopal nagar 2 ml elsr and chanda nagar 0.90 ml elsr along with two years maintenance under central chlorination cell-qat wing
Read moreManjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Manjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Read moreTesting work of 02 nos. bays of 400kv koteshwar - rishikesh line at 400kv substation rishikesh constructed by ms nrss ltd. under tbcb mode
Testing work of 02 nos. bays of 400kv koteshwar - rishikesh line at 400kv substation rishikesh constructed by m/s nrss ltd. under tbcb mode
Read moreof your Industry type