Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Module Storage Works At Bhainsara Site For 500 Mw Bhadla Project
|
| Description |
Module Storage Works At Bhainsara Site For 500 Mw Bhadla Project
|
| Organisation | NTPC Renewable Energy Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPCR_96529_1 |
|
Reference Number |
NREL-CS- ST2-130-2060 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Bhainsara 320 MW solar projectsite |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=99771 |
| Start Date | April 28, 2025 20:30 |
| End Date |
Expired
01/05/2025
Expired 528 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of various valves for tm division in 500 mw unit
Supply of various valves for tm division in 500 mw unit
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreSelection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read moreSpares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit
Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreModule storage works at bhainsara site for 500 mw bhadla project
Module storage works at bhainsara site for 500 mw bhadla project
Read moreUnloading and storage of 630mwp modules for bhadla-ii solar project in320 mw bhainsara solar project site
Unloading and storage of 630mwp modules for bhadla-ii solar project in320 mw bhainsara solar project site
Read moreDeployment of one ac vehicle for executives for 02 months at bhadla-ii solar project (500 mw)
Deployment of one ac vehicle for executives for 02 months at bhadla-ii solar project (500 mw)
Read moreRefurbishment of hpt module of unit 8 mtps 500 mw
Refurbishment of hpt module of unit 8 mtps 500 mw
Read moreof your Industry type