Tender Details

Particulars Details
Title
Fixed Asset 1,Fixed Asset 2,Fixed Asset 3,Fixed Asset 4,Fixed Asset 5,Fixed Asset 6
Description
Organisation Department of Financial Services | Ministry of Finance
Tender Id GEM/2025/B/6064793
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date March 18, 2025 17:41
End Date
Expired 28/03/2025

Expired 563 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Buyer Name: Anjali
Ministry: Ministry Of Finance
Department: Department Of Financial Services
Organisation: Bank Of Maharashtra
Similar Tenders
For repairing and overhauling of 02 nos.6.6kv,vcb switch(i)6.6kv.630a mine line make-vcb sl.no.sa 697 asset no.sbc/24(ii)6.6kv,400a opg power system pvt.make-vcb sl.no.v/149/23-27 asset no.sbc/22 installed at chp central pool substation under asbnc

For repairing and overhauling of 02 nos.6.6kv,vcb switch(i)6.6kv.630a mine line make-vcb sl.no.sa 697 asset no.sbc/24(ii)6.6kv,400a opg power system pvt.make-vcb sl.no.v/149/23-27 asset no.sbc/22 installed at chp central pool substation under asbnc

Read more
Implementation of an on-premise ai/ml-based asset-image analytics platform for automated inspection of distribution network assets of tgnpdcl.

Implementation of an on-premise ai/ml-based asset-image analytics platform for automated inspection of distribution network assets of tgnpdcl.

Read more
For complete repairing and overhauling of flow make pv ii pump 600 gpm,150 mtr. head, 5 stage asset no.sbc/w/s/pv/08 at sendra bansjora w/s under asbnc

For complete repairing and overhauling of flow make pv ii pump 600 gpm,150 mtr. head, 5 stage asset no.sbc/w/s/pv/08 at sendra bansjora w/s under asbnc

Read more
Supply of safai sewak, sewerman, others on dc rate fixed by labour department for 1 year

Supply of safai sewak, sewerman, others on dc rate fixed by labour department for 1 year

Read more
Providing roadside drain, culvert and fixed sprinklers system including three years operation and maintenance around eco park at gevra area, secl

Providing roadside drain, culvert and fixed sprinklers system including three years operation and maintenance around eco park at gevra area, secl

Read more
(i)for maintenance of one no.1 mva 6.6kv/550v transformer installed at loyabad colliery make-ece,asset sl.no.arn/14 lbc(ii)complete rewinding and overhauling of a 750 kva power transformer 6.6kv/550v at 5 pit substation of lbc make-ece asset.no.loy/e

(i)for maintenance of one no.1 mva 6.6kv/550v transformer installed at loyabad colliery make-ece,asset sl.no.arn/14 lbc(ii)complete rewinding and overhauling of a 750 kva power transformer 6.6kv/550v at 5 pit substation of lbc make-ece asset.no.loy/e

Read more
Works contract for fabrication, erection, testing, calibration, etc. for fixed (cone) roof storage tanks in connection with tankage work for lube modernization and bottom upgradation (lmbu) project of hpcl, mumbai refinery, india

Works contract for fabrication, erection, testing, calibration, etc. for fixed (cone) roof storage tanks in connection with tankage work for lube modernization and bottom upgradation (lmbu) project of hpcl, mumbai refinery, india

Read more
Special repairs to single jcos living accn of bldg no p-378 est sec (jcos/or) and provn of protective shed over fixed chimney to prevent ingress of rain water at offrs bungalow and other loc in north complex at ima dehradun.

Special repairs to single jcos living accn of bldg no p-378 est sec (jcos/or) and provn of protective shed over fixed chimney to prevent ingress of rain water at offrs bungalow and other loc in north complex at ima dehradun.

Read more
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)

Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14

Read more
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr

Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise