Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fixed Asset 1,Fixed Asset 2,Fixed Asset 3,Fixed Asset 4,Fixed Asset 5,Fixed Asset 6
|
| Description |
|
| Organisation | Department of Financial Services | Ministry of Finance |
| Tender Id | GEM/2025/B/6064793 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 18, 2025 17:41 |
| End Date |
Expired
28/03/2025
Expired 563 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
For repairing and overhauling of 02 nos.6.6kv,vcb switch(i)6.6kv.630a mine line make-vcb sl.no.sa 697 asset no.sbc/24(ii)6.6kv,400a opg power system pvt.make-vcb sl.no.v/149/23-27 asset no.sbc/22 installed at chp central pool substation under asbnc
For repairing and overhauling of 02 nos.6.6kv,vcb switch(i)6.6kv.630a mine line make-vcb sl.no.sa 697 asset no.sbc/24(ii)6.6kv,400a opg power system pvt.make-vcb sl.no.v/149/23-27 asset no.sbc/22 installed at chp central pool substation under asbnc
Read moreImplementation of an on-premise ai/ml-based asset-image analytics platform for automated inspection of distribution network assets of tgnpdcl.
Implementation of an on-premise ai/ml-based asset-image analytics platform for automated inspection of distribution network assets of tgnpdcl.
Read moreFor complete repairing and overhauling of flow make pv ii pump 600 gpm,150 mtr. head, 5 stage asset no.sbc/w/s/pv/08 at sendra bansjora w/s under asbnc
For complete repairing and overhauling of flow make pv ii pump 600 gpm,150 mtr. head, 5 stage asset no.sbc/w/s/pv/08 at sendra bansjora w/s under asbnc
Read moreSupply of safai sewak, sewerman, others on dc rate fixed by labour department for 1 year
Supply of safai sewak, sewerman, others on dc rate fixed by labour department for 1 year
Read moreProviding roadside drain, culvert and fixed sprinklers system including three years operation and maintenance around eco park at gevra area, secl
Providing roadside drain, culvert and fixed sprinklers system including three years operation and maintenance around eco park at gevra area, secl
Read more(i)for maintenance of one no.1 mva 6.6kv/550v transformer installed at loyabad colliery make-ece,asset sl.no.arn/14 lbc(ii)complete rewinding and overhauling of a 750 kva power transformer 6.6kv/550v at 5 pit substation of lbc make-ece asset.no.loy/e
(i)for maintenance of one no.1 mva 6.6kv/550v transformer installed at loyabad colliery make-ece,asset sl.no.arn/14 lbc(ii)complete rewinding and overhauling of a 750 kva power transformer 6.6kv/550v at 5 pit substation of lbc make-ece asset.no.loy/e
Read moreWorks contract for fabrication, erection, testing, calibration, etc. for fixed (cone) roof storage tanks in connection with tankage work for lube modernization and bottom upgradation (lmbu) project of hpcl, mumbai refinery, india
Works contract for fabrication, erection, testing, calibration, etc. for fixed (cone) roof storage tanks in connection with tankage work for lube modernization and bottom upgradation (lmbu) project of hpcl, mumbai refinery, india
Read moreSpecial repairs to single jcos living accn of bldg no p-378 est sec (jcos/or) and provn of protective shed over fixed chimney to prevent ingress of rain water at offrs bungalow and other loc in north complex at ima dehradun.
Special repairs to single jcos living accn of bldg no p-378 est sec (jcos/or) and provn of protective shed over fixed chimney to prevent ingress of rain water at offrs bungalow and other loc in north complex at ima dehradun.
Read moreOperation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read morePart i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18
Read moreof your Industry type