Tender Details
Particulars | Details |
---|---|
Title |
Transporting Installation And Commissioning Of 7 Stage 1000 Gpm Centrifugal Pump With Power Setup And Water Delivery Range To Surface In Rvi Seam Of Cm Project At Nakrakonda Kumardihi B Colliery Under Bankola Area.
|
Description |
Transporting Installation And Commissioning Of 7 Stage 1000 Gpm Centrifugal Pump With Power Setup And Water Delivery Range To Surface In Rvi Seam Of Cm Project At Nakrakonda Kumardihi B Colliery Under Bankola Area.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_332722_1 |
Reference Number |
ECL/GM/BA/E TENDER/24-25/ENM/472 Dt 17.03.2025 |
Tender Fee | 0 |
EMD | 24000 |
Tender Value | |
Place | Nakrakonda Kumardihi B Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344907 |
Start Date | March 17, 2025 19:30 |
End Date |
27/03/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.
Construction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.
Read moreInstallation, commissioning of conveyor belts in rv seam for schm package of cm project at nakrakonda kumardihi b colliery under bankola area.
Installation, commissioning of conveyor belts in rv seam for schm package of cm project at nakrakonda kumardihi b colliery under bankola area.
Read moreInstallation of power transformer with switch at kumardihi b ocp surface substation of kumardihi b colliery ocp under bankola area.
Installation of power transformer with switch at kumardihi b ocp surface substation of kumardihi b colliery ocp under bankola area.
Read moreInstallation of 240m head 3.3 kv pump with electricals complete suction delivery range and pump foundation at 21l 3d in rvii of shyamsundarpur colliery under bankola area.
Installation of 240m head 3.3 kv pump with electricals complete suction delivery range and pump foundation at 21l 3d in rvii of shyamsundarpur colliery under bankola area.
Read moreOverhead line lt erection from cm project 33kv surface substation to submersible pumping side of kumardihi b colliery ocp under bankola area.
Overhead line lt erection from cm project 33kv surface substation to submersible pumping side of kumardihi b colliery ocp under bankola area.
Read moreInstallation and commissioning of 800mm wide x75 mtr long at 15r 19wl. up to 15r 22wl initially 26 meter and then phase wise extension in time interval in rviib seam of kumardihi a colliery under bankola area
Installation and commissioning of 800mm wide x75 mtr long at 15r 19wl. up to 15r 22wl initially 26 meter and then phase wise extension in time interval in rviib seam of kumardihi a colliery under bankola area
Read moreInstallation and commissioning of 11kv 440volt transformer and overhead line 3 phase 4wire ab cable feeding power to under construction incline of shyamsundarpur colliery under bankola area
Installation and commissioning of 11kv 440volt transformer and overhead line 3 phase 4wire ab cable feeding power to under construction incline of shyamsundarpur colliery under bankola area
Read moreTransporting installation and commissioning of 7 stage 1000 gpm centrifugal pump with power setup and water delivery range to surface in rvi seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Transporting installation and commissioning of 7 stage 1000 gpm centrifugal pump with power setup and water delivery range to surface in rvi seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Read moreSupply and installation of sal wood drum lagging in electrical winder of pit no 6 of cm project at nakrakonda kumardihi b colliery under bankola area (retender).
Supply and installation of sal wood drum lagging in electrical winder of pit no 6 of cm project at nakrakonda kumardihi b colliery under bankola area (retender).
Read moreInstallation testing and commissioning of 440 volt power distribution system at 3.3 kv surface substation of kum a colliery under bankola area.
Installation testing and commissioning of 440 volt power distribution system at 3.3 kv surface substation of kum a colliery under bankola area.
Read moreof your Industry type