Tender Details
Particulars | Details |
---|---|
Title |
Operation And Maintenance With Partial Development Of Nisarg Udyan And Powai Lake Promenade From Ganesh Ghat To Pawarwadi, Powai In S Ward Under Aeoc T.M. Division.
|
Description |
Operation And Maintenance With Partial Development Of Nisarg Udyan And Powai Lake Promenade From Ganesh Ghat To Pawarwadi, Powai In S Ward Under Aeoc T.M. Division.
|
Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
Tender Id | 2024_MCGM_1023440_1 |
Reference Number |
Dy.HE/11106/Maint. dated.01.03.2024 |
Tender Fee | 0 |
EMD | 3.44 Lakh |
Tender Value | |
Place | Powai lake |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1793264 |
Start Date | March 05, 2024 16:30 |
End Date |
14/03/2024 ( Expired 451 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read morePerformance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreChief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Read moreShort term maintenance to kanaka durga flyover from km. 0/000( 269/900) to km. 5/122 (275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh
Short term maintenance to kanaka durga lyover from km.0/000( 269/900) to km.5/122(275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh
Read moreof your Industry type