Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing Works Of Mla 200 X 225 Pump, 1000 Gpm, 167 Mtrs. Head, Make Kirlosker For De Watering From Gvp Phase Ii Ocp.
|
Description |
Repairing Works Of Mla 200 X 225 Pump, 1000 Gpm, 167 Mtrs. Head, Make Kirlosker For De Watering From Gvp Phase Ii Ocp.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_282558_1 |
Reference Number |
PE(EandM)/GVP/Tender/23-24/223 dt-29.06.23 |
Tender Fee | |
EMD | 2000 |
Tender Value | |
Place | P.E.(E and M), GVP Ph-II, PO Sawang Colliery, Dist |
Link | https://coalindiatenders.nic.in |
Start Date | June 30, 2023 15:30 |
End Date |
10/07/2023 ( Expired 728 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreLabour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Labour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Read moreCalibration of existing ets model no. zt20r-2, make- geomax and purchase of 03 nos. of complete prism for survey section, govindpur phase-ii, ocp, kathara area.
Calibration of existing ets model no. zt20r-2, make- geomax and purchase of 03 nos. of complete prism for survey section, govindpur phase-ii, ocp, kathara area.
Read moreProviding sewerage monoblock with pto pump 5ft x 5ft heavy duty with all accessories for de-watering of stinging/flooded water no.20, faridabad
Providing sewerage monoblock with pto pump 5ft x 5ft heavy duty with all accessories for de-watering of stinging/flooded water no.20, faridabad
Read more(part-a) 1000 gpm pump, make - kirloskar oil engines itd. from one place to other place within 30 meters radius with 6 inch dia. 24 mtrs. welding near delivery side of pump, due to decreased water level at cs-34 sump and new pipes of 6 inch dia. 70 m
(part-a) 1000 gpm pump, make - kirloskar oil engines itd. from one place to other place within 30 meters radius with 6 inch dia. 24 mtrs. welding near delivery side of pump, due to decreased water level at cs-34 sump and new pipes of 6 inch dia. 70 m
Read moreVarious civil works for repairing, deepening and maintenance of bore wells with submersible pump at various places under xen (o and m) dd-i, dd-ii, dudu, vatika and sambhar (2025-26).
Various civil works for repairing, deepening and maintenance of bore wells with submersible pump at various places under xen (o and m) dd-i, dd-ii, dudu, vatika and sambhar (2025-26).
Read moreTtps operation circle oe ii erection of 150 mtrs 200 nb ms erw pipe lines for fire protection mulsifyre line from clarified water pump house to service building
Ttps operation circle oe ii erection of 150 mtrs 200 nb ms erw pipe lines for fire protection mulsifyre line from clarified water pump house to service building
Read moreRe-construction of foundation block for laying of foundation plate of hc pump having specification of 35000 gph x 150 meter head and allied works at cps muthi phase ii (unit no. 4).
Re-construction of foundation block for laying of foundation plate of hc pump having specification of 35000 gph x 150 meter head and allied works at cps muthi phase ii (unit no. 4).
Read moreComprehensive annual maintenance contract (camc) including repairing of digitiser and replacement of load cell digital make electronic road w/b 50te capacity installed at zero point sl. no. 201804008 and check post sl. no.101141748 of gvp phase-ii o
Comprehensive annual maintenance contract (camc) including repairing of digitiser and replacement of load cell digital make electronic road w/b 50te capacity installed at zero point sl. no. 201804008 and check post sl. no.101141748 of gvp phase-ii o
Read moreComplete repairing of 01 no. 2000 gpm pump make wilo mnp type 10/12 pluro x 2chrs pump 490/490 mm head 150 mtr,sl.no. 81316960/20/10 under rajhara ocp, rajhara area
Complete repairing of 01 no. 2000 gpm pump make wilo mnp type 10/12 pluro x 2chrs pump 490/490 mm head 150 mtr,sl.no. 81316960/20/10 under rajhara ocp, rajhara area
Read moreof your Industry type