Tender Details

Particulars Details
Title
Canal Restoration/ Correction And Selective Lining Works On Nandur Madhmeshwar Branch Canal 2 And Its Dy In Between Ch. 0 To 15000 M And Ch. 15000 To 16400 M And Dy 5 Of Branch Canal 1
Description
Canal Restoration/ Correction And Selective Lining Works On Nandur &Amp#X0d Madhmeshwar Branch Canal 2 And Its Dy In Between Ch. 0 To 15000 M And Ch. 15000 To 16400 M And Dy 5 Of Branch Canal 1
Organisation CE and CA CADA Aurangabad | State Govt. and UT
Tender Id 2024_PAHN_1041215_1
Reference
Number
E Tender/Notice 04/ 2024-25
Tender Fee 6400
EMD 6.03 Lakh
Tender Value
Place NMC Vaijapur
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2005534
Start Date February 20, 2025 23:15
End Date

06/03/2025 ( Expired 120 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
8707 special repair to roof leakage of block 1 cl 2 3 and block 2 cl 5 6 of kv school provn of chain link fencing on boundary wall at vikram batra enclave provn of stone grill spl rep to bldg no t34 servant qtr under br i and brii em ii ges pune

8707 special repair to roof leakage of block 1 cl 2 3 and block 2 cl 5 6 of kv school provn of chain link fencing on boundary wall at vikram batra enclave provn of stone grill spl rep to bldg no t34 servant qtr under br i and brii em ii ges pune

Read more
Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak

Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)

Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect&amp#x0d phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)&amp#x0d

Read more
Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar

Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar

Read more
Construction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.

Construction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise