Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Side Walls And Girder Support Along 35 L In Between 0 Xd And 1 Xd And In Between 0 Xd And Minus 1 Xd In Rviia Seam At 3 And 4 Incline Unit Jpc
|
| Description |
Construction Of Side Walls And Girder Support Along 35 L In Between 0 Xd And 1 Xd And In Between 0 Xd And Minus 1 Xd In Rviia Seam At 3 And 4 Incline Unit Jpc
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_336555_1 |
|
Reference Number |
ECL/GM/JNR/MIN.A/25-26/04 Dt.28.05.2025 |
| Tender Fee | 0 |
| EMD | 4100 |
| Tender Value | |
| Place | Jhanjra Project Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348869 |
| Start Date | May 31, 2025 16:30 |
| End Date |
Expired
12/06/2025
Expired 379 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConstruction of 7 nos brick sectionalisation stoppings required at minus 1xd 0xd 1xd and 2xd in between 35l and 36l and 34l and 35l in between -1xd and minus 2xd and 36l in between 2xd and 3xd of rviia seam at 3 and 4 incline unit under jpc
Construction of 7 nos brick sectionalisation stoppings required at minus 1xd 0xd 1xd and 2xd in between 35l and 36l and 34l and 35l in between -1xd and minus 2xd and 36l in between 2xd and 3xd of rviia seam at 3 and 4 incline unit under jpc
Read moreConstruction of 7nos. sectionalisation stoppings at -1xd, 0xd, 1xd, 2xd in between 35l and 36l and 34l, 35l in between -1xd and -2xd and 36l in between 2xd and 3xd of r-viia seam at 3and4 incline unit under jpc.
Construction of 7nos. sectionalisation stoppings at -1xd, 0xd, 1xd, 2xd in between 35l and 36l and 34l, 35l in between -1xd and -2xd and 36l in between 2xd and 3xd of r-viia seam at 3and4 incline unit under jpc.
Read moreConstruction of false roofing with girders and precast blocks upon brick side walls at -13xd drift in rviia seam of 3 and 4 incline under jpc.
Construction of false roofing with girders and precast blocks upon brick side walls at -13xd drift in rviia seam of 3 and 4 incline under jpc.
Read moreConstruction of 7nos sectionalisation stoppings in between 86l and 87l from 2d to 8d of rviia seam at 3 and 4 incline unit under jpc
Construction of 7nos sectionalisation stoppings in between 86l and 87l from 2d to 8d of rviia seam at 3 and 4 incline unit under jpc
Read moreRoof support by side wall guide wall in various locations in rvii seam at 3 and 4 incline unit under jpc
Roof support by side wall guide wall in various locations in rvii seam at 3 and 4 incline unit under jpc
Read moreInstallation, fabrication and trail run of 1200mm width belt conveyor with electricals along 30l from 1xd to -1xd in rviia seam at 3n4 incline under jhanjra area
Installation, fabrication and trail run of 1200mm width belt conveyor with electricals along 30l from 1xd to -1xd in rviia seam at 3n4 incline under jhanjra area.
Read moreConstruction of 10 nos sectionalisation stopping 30 cm thick to sectionalize in between panel 9a and panel 10 of rviia seam at 3 and 4 incline under jpc
Construction of 10 nos sectionalisation stopping 30 cm thick to sectionalize in between panel 9a and panel 10 of rviia seam at 3 and 4 incline under jpc
Read moreMuck and debris cleaning along 3rd belt conveyor in rvii and rviia seam at 3 and 4 incline unit of jhanjra project colliery
Muck and debris cleaning along 3rd belt conveyor in rvii and rviia seam at 3 and 4 incline unit of jhanjra project colliery
Read moreof your Industry type