Tender Details

Particulars Details
Title
Construction Of Side Walls And Girder Support Along 35 L In Between 0 Xd And 1 Xd And In Between 0 Xd And Minus 1 Xd In Rviia Seam At 3 And 4 Incline Unit Jpc
Description
Construction Of Side Walls And Girder Support Along 35 L In Between 0 Xd And 1 Xd And In Between 0 Xd And Minus 1 Xd In Rviia Seam At 3 And 4 Incline Unit Jpc
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_336555_1
Reference
Number
ECL/GM/JNR/MIN.A/25-26/04 Dt.28.05.2025
Tender Fee 0
EMD 4100
Tender Value
Place Jhanjra Project Colliery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348869

Start Date May 31, 2025 16:30
End Date
Expired 12/06/2025

Expired 379 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)

Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Construction of 7 nos brick sectionalisation stoppings required at minus 1xd 0xd 1xd and 2xd in between 35l and 36l and 34l and 35l in between -1xd and minus 2xd and 36l in between 2xd and 3xd of rviia seam at 3 and 4 incline unit under jpc

Construction of 7 nos brick sectionalisation stoppings required at minus 1xd 0xd 1xd and 2xd in between 35l and 36l and 34l and 35l in between -1xd and minus 2xd and 36l in between 2xd and 3xd of rviia seam at 3 and 4 incline unit under jpc

Read more
Construction of 7nos. sectionalisation stoppings at -1xd, 0xd, 1xd, 2xd in between 35l and 36l and 34l, 35l in between -1xd and -2xd and 36l in between 2xd and 3xd of r-viia seam at 3and4 incline unit under jpc.

Construction of 7nos. sectionalisation stoppings at -1xd, 0xd, 1xd, 2xd in between 35l and 36l and 34l, 35l in between -1xd and -2xd and 36l in between 2xd and 3xd of r-viia seam at 3and4 incline unit under jpc.

Read more
Construction of false roofing with girders and precast blocks upon brick side walls at -13xd drift in rviia seam of 3 and 4 incline under jpc.

Construction of false roofing with girders and precast blocks upon brick side walls at -13xd drift in rviia seam of 3 and 4 incline under jpc.

Read more
Construction of 7nos sectionalisation stoppings in between 86l and 87l from 2d to 8d of rviia seam at 3 and 4 incline unit under jpc

Construction of 7nos sectionalisation stoppings in between 86l and 87l from 2d to 8d of rviia seam at 3 and 4 incline unit under jpc

Read more
Roof support by side wall guide wall in various locations in rvii seam at 3 and 4 incline unit under jpc

Roof support by side wall guide wall in various locations in rvii seam at 3 and 4 incline unit under jpc

Read more
Installation, fabrication and trail run of 1200mm width belt conveyor with electricals along 30l from 1xd to -1xd in rviia seam at 3n4 incline under jhanjra area

Installation, fabrication and trail run of 1200mm width belt conveyor with electricals along 30l from 1xd to -1xd in rviia seam at 3n4 incline under jhanjra area.

Read more
Construction of 10 nos sectionalisation stopping 30 cm thick to sectionalize in between panel 9a and panel 10 of rviia seam at 3 and 4 incline under jpc

Construction of 10 nos sectionalisation stopping 30 cm thick to sectionalize in between panel 9a and panel 10 of rviia seam at 3 and 4 incline under jpc

Read more
Muck and debris cleaning along 3rd belt conveyor in rvii and rviia seam at 3 and 4 incline unit of jhanjra project colliery

Muck and debris cleaning along 3rd belt conveyor in rvii and rviia seam at 3 and 4 incline unit of jhanjra project colliery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise