Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Enhancement Of Material 20 Percent Mn Gml567 Available Near Ocf Area Of Gumgaon Mine.
|
| Description |
Enhancement Of Material 20 Percent Mn Gml567 Available Near Ocf Area Of Gumgaon Mine.
|
| Organisation | MOIL Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_MOIL_800123_1 |
|
Reference Number |
Agent/Gum/Min/2025-26/280, DT 31.05.2025 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Gumgaon Mine |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1104760 |
| Start Date | May 31, 2025 20:30 |
| End Date |
Expired
09/06/2025
Expired 491 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Estimate for cement concrete lining of keriyan minor (with 20 percent enhancement) slice rd 0-22800
Estimate for cement concrete lining of keriyan minor (with 20 percent enhancement) slice rd 0-22800
Read moreEstimate for cement concrete lining of hauz disty (with 20 percent enhancement) slice rd 0-12300 including pucca structure
Estimate for cement concrete lining of hauz disty (with 20 percent enhancement) slice rd 0-12300 including pucca structure
Read moreEstimate for cement concrete lining of sarian minor (with 20 percent enhancement) slice rd 0-14000 including pucca structure
Estimate for cement concrete lining of sarian minor (with 20 percent enhancement) slice rd 0-14000 including pucca structure
Read moreEstimate for cement concrete lining of hauz disty (with 20 percent enhancement) slice rd 12300-28762 including pucca structures.
Estimate for cement concrete lining of hauz disty (with 20 percent enhancement) slice rd 12300-28762 including pucca structures.
Read moreEstimate for cement concrete lining of mauzam minor (with 20 percent enhancement) slice rd 6000-23000 including pucca structure.
Estimate for cement concrete lining of mauzam minor (with 20 percent enhancement) slice rd 6000-23000 including pucca structure.
Read moreEstimate for cement concrete lining of mauzam minor (with 20 percent enhancement) slice rd 43600-69700 including pucca structure.
Estimate for cement concrete lining of mauzam minor (with 20 percent enhancement) slice rd 43600-69700 including pucca structure.
Read moreEstimate for cement concrete lining of mauzam minor (with 20 percent enhancement) slice rd 23000-43600 including pucca structure
Estimate for cement concrete lining of mauzam minor (with 20 percent enhancement) slice rd 23000-43600 including pucca structure
Read moreEstimate for cement concrete lining of keriyan minor (with 20 percent enhancement) slice rd 22800-42470 including pucca structure.
Estimate for cement concrete lining of keriyan minor (with 20 percent enhancement) slice rd 22800-42470 including pucca structure.
Read moreEstimate for cement concrete lining of roran wali disty (with 20 percent enhancement) rd 0-11000 including pucca structure
Estimate for cement concrete lining of roran wali disty (with 20 percent enhancement) rd 0-11000 including pucca structure
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type