Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ltg/311/Wd 333/Br Iii/Z 1/2324
|
| Description |
Operation And Maintenance And Repairing Of High Mast At Different Places In Wd No 31,32,33,34 And 35 Under Br Iii
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_KMC_604241_1 |
|
Reference Number |
LTG/311/WD-333/BR-III/Z-1/2324 |
| Tender Fee | 0 |
| EMD | 4000 |
| Tender Value | - |
| Place | office of the Ex-Engineer (E)/ltg/Z-I |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | November 11, 2023 00:00 |
| End Date |
Expired
25/11/2023
Expired 1051 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Filling of pot holes with stone dust , gravel at gandhi school and in various places in division no 35 for saddula bathukamma festival of municipal corporation karimnagar est. cost of rs. 1.80 lakhs under mgf
Filling of pot holes with stone dust , gravel at gandhi school and in various places in division no 35 for saddula bathukamma festival of municipal corporation karimnagar est. cost of rs. 1.80 lakhs under mgf
Read moreProcurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2
Procurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2
Read moreOperation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read moreManning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Manning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreLtg/84/wd-35/br-iii/z-i/24-25
Repairing and replacement work of lighting system at kundu bagan bustee miya bagan bustee and other bustees in ward no-35
Read moreLtg/108/wd-35/br-iii/z-1/24-25
Repairing and replacement of street lighting arrangement at rakhal ghosh lane, raja rajendra mitra lane and other places within ward no-35
Read moreLtg/05/wd-35/br-iii/z-1/24-25
Installation of 2 (two) nos. ac machines in the chamber of the member and ground floor room for accountant / deo, waqf tribunal at 125 hemchandra naskar rd under wd-35
Read moreLtg/281/wd-35/br-iii/z-1/24-25
Improvement of street lighting arrangement with led light fittings at different places in ward no 35 under br-iii&#x0d &#x0d
Read moreLtg/283/wd-35/br-iii/z-1/24-25
Repairing and replacement of street lighting arrangement with led fittings for better illumination at the different places in ward no-35 under br-iii
Read moreof your Industry type