Tender Details
Particulars | Details |
---|---|
Title |
Tn No. 3938/3 A Dated 12. Special Repair Work From Pc And Cc On Km 30 To Kamalpur Road Of Fatehpur Muzaffarabad Kalsia Road.
|
Description |
Special Repair Work From Pc And Cc On Km 30 To Kamalpur Road Of Fatehpur Muzaffarabad Kalsia Road.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_CEMRT_859172_12 |
Reference Number |
TN No 3938/3A dated 25.10.2023 |
Tender Fee | 854 |
EMD | 3.32 Lakh |
Tender Value | |
Place | EE PD PWD Saharanpur |
Link | https://etender.up.nic.in |
Start Date | November 03, 2023 22:30 |
End Date |
08/11/2023 ( Expired 559 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreof your Industry type