Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Augmentation Of Water Supply Scheme Udhampur Town Under Amrut 2.0 Incl. Operation And Maintenance For 05 Years Scope Of Work As Per Sbd
|
Description |
Augmentation Of Water Supply Scheme Udhampur Town Under Amrut 2.0 Incl. Operation And Maintenance For 05 Years Scope Of Work As Per Sbd
|
Organisation | PHE | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 15000 |
EMD | 1.45 Crore |
Tender Value | |
Place | UDHAMPUR TOWN |
Link |
AAAAAAAAAA Login to view |
Start Date | July 08, 2025 16:30 |
End Date |
26/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreSupply, manning, operation and maintenance of one tug of 40 ton bollard pull (asd/srp/voith) or more of rsv type-4/india coastal vessel for haldia dock complex for a period of seven years.
Supply, manning, operation and maintenance of one tug of 40 ton bollard pull (asd/srp/voith) or more of rsv type-4/india coastal vessel for haldia dock complex for a period of seven years.
Read moreImplementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreDevelopment of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Read moreSelection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme
Selection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme.
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read moreSupply and stacking of stone boulder, stone metal chips of various sizes coarse sand, burnt clay bricks and ordinary soil selected earth for maintenance of dcbs at different locations in the aor of 7 inf div under 141 dmc in the state of punjab
Supply and stacking of stone boulder, stone metal chips of various sizes coarse sand, burnt clay bricks and ordinary soil selected earth for maintenance of dcbs at different locations in the aor of 7 inf div under 141 dmc in the state of punjab
Read moreEmpanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines
Read morePre-dispatch inspection, supply, installation, testing, commissioning, training and warranty of plc based in cell equipment for production of iodine 131 and spares as per the attached specification
Pre-dispatch inspection, supply, installation, testing, commissioning, training and warranty of plc based in cell equipment for production of iodine 131 and spares as per the attached specification
Read moreof your Industry type