Tender Details

Particulars Details
Title
Erection, Di And Dismantling Of 11 Kv Ht, Lt Overhead Line Of Mppkvv Co. Ltd. From East Substation To Deeh Baba And Deeh Baba To Near West Substation Due To Extension Of Jayant Mine Under Morwa Zone As Per The Estimated Coal Of Mppkvv Co. Ltd.
Description
Erection, Di And Dismantling Of 11 Kv Ht, Lt Overhead Line Of Mppkvv Co. Ltd. From East Substation To Deeh Baba And Deeh Baba To Near West Substation Due To Extension Of Jayant Mine Under Morwa Zone As Per The Estimated Coal Of Mppkvv Co. Ltd.
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_NCL_329348_1
Reference
Number
NCL/JNT/EandM/Tender/24-25/674
Tender Fee 0
EMD 38800
Tender Value
Place EandM Mines Jayant NCL
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341365
Start Date February 18, 2025 14:30
End Date

28/02/2025 ( Expired 53 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Work of attending to resolving the fuse-off-call complaints and lt/ht line breakdowns for restoration of electrical power supply in the various sub-divisions under ce/ds west zone, pspcl, bathinda.

Work of attending to resolving the fuse-off-call complaints and lt/ht line breakdowns for restoration of electrical power supply in the various sub-divisions under ce/ds west zone, pspcl, bathinda.

Read more
Amc for erection/ dismantle of poles, oh materials etc for re-arrangement and extension of 3.3kv oh lines due to advancement of ob and coal face in mine under rohini project, nk area

Amc for erection/ dismantle of poles, oh materials etc for re-arrangement and extension of 3.3kv oh lines due to advancement of ob and coal face in mine under rohini project, nk area

Read more
Erection of 3.3 kv overhead line from main substation to west substation at jhingurda project

Erection of 3.3 kv overhead line from main substation to west substation at jhingurda project

Read more
Dismantling, erection and di of 3.3 kv overhead lines of 02 nos of pump feeders(vcb-4 and ngef-3) from north side of mine to west side of lajkura ocp,ib valley area

Dismantling, erection and di of 3.3 kv overhead lines of 02 nos of pump feeders(vcb-4 and ngef-3) from north side of mine to west side of lajkura ocp,ib valley area

Read more
Ee/vhelidn/ lakhmapur-pimpaldhara ht,lt line and transformer /47/2024-25(2nd call)

Supply,erection,testing and commissioning of 11kv ht line,lt line, 25kva 11/0.433kv transformer, 63kva 11/0.433kv transformer and dismantalling of 24km line due to submergence at lakhmapur- pimpaldhara tal.hingna dist.nagpur.

Read more
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Read more
Dismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area

Dismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area

Read more
Erection and extension of 440v overhead line from main substation to kali mandir of topa ocp under kuju area.

Erection and extension of 440v overhead line from main substation to kali mandir of topa ocp under kuju area.

Read more
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Read more
Extension of new ht/lt line by 200kva and 100kva sub-station with 11kv covered conductor 1cx70mm2 to give three phase service connection to water innovative source and a water boosting station at tapsa para

Extension of new ht/lt line by 200kva and 100kva sub-station with 11kv covered conductor 1cx70mm2 to give three phase service connection to water innovative source and a water boosting station at tapsa para

Read more
Click Here to Download Dockets
of your Industry type