Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply, Delivery, Erection, Testing And Commissioning Of Split Ac Machine Having Capacity 5.0 Tr (1 2) And 2.0 Tr Furred In, Split Ac Machine (Condenser And Evaporator Unit Must Be Of Full Copper) For 2nd And 3rd Floor For Newly Constructed 3 (Three)
|
Description |
Supply, Delivery, Erection, Testing And Commissioning Of Split Ac Machine Having Capacity 5.0 Tr (1 2) And 2.0 Tr Furred In, Split Ac Machine (Condenser And Evaporator Unit Must Be Of Full Copper) For 2nd And 3rd Floor For Newly Constructed 3 (Three)
|
Organisation | Government of West Bengal |
Tender Id | 2023_SETCL_554152_1 |
Reference Number |
ACE/ KTZ /Kasba/Supp and Erec/AC Machine/23-24/13 |
Tender Fee | 2360 |
EMD | 20000 |
Tender Value | |
Place | ADDITIONAL CHIEF ENGINEER KTZ |
Link | https://wbtenders.gov.in |
Start Date | August 21, 2023 14:30 |
End Date |
25/09/2023 ( Expired 649 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of lift shaft for sagar milan guest house including supply, installation, testing and commissioning of passengers lift having 6 persons capacity for g2 floors with machine room less elevator including all accessories
Construction of lift shaft for sagar milan guest house including supply, installation, testing and commissioning of passengers lift having 6 persons capacity for g2 floors with machine room less elevator including all accessories
Read moreSupply, installation, testing and commissioning of 4.0 tr non inverter tower type split and 2.0 tr inverter type hi wall split air conditioning units for science on sphere hall at 2nd floor of national science centre, delhi
Supply, installation, testing and 
 commissioning of 4.0 tr non inverter tower type 
 split and 2.0 tr inverter type hi wall split air 
 conditioning units for science on sphere hall at 2nd 
 floor of national science centre, delhi
Read moreWaterproofing and renovation of multipurpose hall, phs, installation of ac 6 nos, 2.0 tr, capacity split type air conditioners and allied works at auditorium of govt. iti for women sector 11, chandigarh.
Waterproofing and renovation of multipurpose hall, phs, installation of ac 6 nos, 2.0 tr, capacity split type air conditioners and allied works at auditorium of govt. iti for women sector 11, chandigarh.
Read moreUrgent requiretment of 2 nos. 16.5 kw/ 5.0 tr cooling capacity concealed split ac machine with allied electrical installation works at server room, department of it personnel, computer server room at 3rd floor of ronald ross building within the comp
Urgent requiretment of 2 nos. 16.5 kw/ 5.0 tr cooling capacity concealed split ac machine with allied electrical installation works at server room, department of it personnel, computer server room at 3rd floor of ronald ross building within the comp
Read moreSupply, erection, testing and commissioning of complete door assemblies, panel and ropes for unit-ii boiler rhs lift capacity of 3 ton
Supply, erection, testing and commissioning of complete door assemblies, panel and ropes for unit-ii boiler rhs lift capacity of 3 ton
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreSitc of booster pump, 2 tr split ac for camp office and providing cctv surveilance for external security at newly constructed campus of type-vii quarter for cpmg residence , sec-o, aliganj lucknow
Sitc of booster pump, 2 tr split ac for camp office and providing cctv surveilance for external security at newly constructed campus of type-vii quarter for cpmg residence , sec-o, aliganj lucknow
Read moreSupplying, fixing, testing and commissioning of split ac for academics section located on the 2nd floor of the administrative block at main campus
Supplying, fixing, testing and commissioning of split ac for academics section located on the 2nd floor of the administrative block at main campus
Read moreAnnual comprehensive maintenance of air conditioners for the work of existing split type ac machine and hitachi make v.r.f. unit installed at d.d building, lalbazar kolkata (274 days) wef 01.07.2025 to 31.03.2026. (2nd call)
Annual comprehensive maintenance of air conditioners for the work of existing split type ac machine and hitachi make v.r.f. unit installed at d.d building, lalbazar kolkata (274 days) wef 01.07.2025 to 31.03.2026. (2nd call)
Read moreSupply, installation, testing and commissioning of 02 nos. of 100 tr ac unit at power and blowing st
Supply, installation, testing and commissioning of 02 nos. of 100 tr ac unit at power and blowing station (pbs), as modification, for cpp-i (m) department
Read moreof your Industry type