Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Washrooms Of Divisional Office Of Jal Shakti (Phe) Ground Water Division Srinagar.
|
| Description |
Repairing Of Washrooms Of&Amp#X0d
Divisional Office Of Jal Shakti&Amp#X0d
(Phe) Ground Water Division&Amp#X0d
Srinagar.
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2025_PHE_294625_1 |
|
Reference Number |
e-NIT No 56 of 2025-26 |
| Tender Fee | 100 |
| EMD | 7200 |
| Tender Value | |
| Place | Nowshera Srinagar |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=953107 |
| Start Date | November 08, 2025 22:30 |
| End Date |
Expired
14/11/2025
Expired 230 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of sub division office building at jalsu, jaipur.
Construction of sub division office building at jalsu, jaipur.
Read moreRate contract for supply, fabrication and erection of mild steel canopy and allied works at retail outlets under guwahati, tinsukia, silchar and imphal divisional offices of ioaod state office
Rate contract for supply, fabrication and erection of mild steel canopy and allied works at retail outlets under guwahati, tinsukia, silchar and imphal divisional offices of ioaod state office
Read moreAnnual operation and maintenance of central air condition work at kda main office building ground first, second, thrd floor and auditorium.
Annual operation and maintenance of central air condition work at kda main office building ground, first, second, thrd floor and auditorium.
Read moreImprovement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Improvement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Read moreWork related to operation of completed jjm schemes for maintaining water supply in fy 2025-26 under sub division aburoad,dn aburoad
Work related to operation of completed jjm schemes for maintaining water supply in fy 2025-26 under sub division aburoad,dn aburoad
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreEngagement of special third party independent techno financial auditor for techno financial audit amrut 2.0 under the jurisdiction of punjab water supply and sewerage division no. 2, patiala.
Engagement of special third party independent techno financial auditor for techno financial audit amrut 2.0 under the jurisdiction of punjab water supply and sewerage division no. 2, patiala.
Read moreSpecial repairing of field section, pump house, battery, office rooms, providing 05 nos. structural steel gate at main entrance, renovation of damaged boundary wall at side of dumper section of excavation workshop of socp under ibva (1st re-tender)
Special repairing of field section, pump house, battery, office rooms, providing 05 nos. structural steel gate at main entrance, renovation of damaged boundary wall at side of dumper section of excavation workshop of socp under ibva (1st re-tender)
Read moreA/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
Read moreRepair and renovation of divisional office by way of face lifting to the divisional office building of jal shakti (phe) ground water division srinagar under m and r.
Repair and renovation of divisional office by way of face lifting to the divisional office building of jal shakti (phe) ground water division srinagar under m and r.
Read moreof your Industry type