Tender Details
Particulars | Details |
---|---|
Title |
Mtps I M Ii Oahs Ash Slurry Lines Dismantling Of Existing Heavily Worn Out Ash Slurry Ms Pipes And Erection Of Old Used 350 Nb Ms Erw Pipes 900 Mtrs
|
Description |
Mtps I M Ii Oahs Ash Slurry Lines Dismantling Of Existing Heavily Worn Out Ash Slurry Ms Pipes And Erection Of Old Used 350 Nb Ms Erw Pipes 900 Mtrs
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_417940_1 |
Reference Number |
CE SE M II MTPS I OAH OT 51 2023 2024 |
Tender Fee | 0 |
EMD | 11000 |
Tender Value | |
Place | MTPS-I |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=497090 |
Start Date | February 03, 2024 16:10 |
End Date |
19/02/2024 ( Expired 475 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Read moreNctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Nctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreMtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreMtps i 4x210mw m ii circle coal handling system first phase of initial revamping repair rectification works of chp entire conveyor system by procurement and erection of conveyor belts
Mtps i 4x210mw m ii circle coal handling system first phase of initial revamping repair rectification works of chp entire conveyor system by procurement and erection of conveyor belts
Read moreMtps i chp ii mechanical sub division erection of 150 nb ms erw pipes with bends from ash handling pump house stage i high pressure pump to fire water pipe line
Mtps i chp ii mechanical sub division erection of 150 nb ms erw pipes with bends from ash handling pump house stage i high pressure pump to fire water pipe line
Read moreof your Industry type