Tender Details
Particulars | Details |
---|---|
Title |
2 Upgradation Of Link Road From Airport Khurbathang To Khardong Shakulchay Pashkum Rd 7800mtrs To Rd11200mts Including 700 Mtrs Lenghth At Tharumsa Pashkum Limb Under Crif
|
Description |
2&Amp#X0d
Upgradation Of Link Road From Airport Khurbathang To Khardong Shakulchay Pashkum Rd 7800mtrs To Rd11200mts Including 700 Mtrs Lenghth At Tharumsa Pashkum Limb Under Crif&Amp#X0d
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2795 |
EMD | 5.59 Lakh |
Tender Value | |
Place | kargil |
Link |
AAAAAAAAAA Login to view |
Start Date | June 09, 2025 14:30 |
End Date |
28/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreConstruction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block
Construction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreReconstruction of gdm and widening and strengthening of manunagar
Reconstruction of gadarpur-dineshpur-matkota-haldwani (sh-5) motor road from km 0.000 to 16.000 and widening and strengthening of manunagar-gadarpur-dineshpur-matkota-haldwani (sh-5 ext.) motor road under crif.
Read moreConstruction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Read moreConstruction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Construction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Read moreSurface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Surface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreof your Industry type