Tender Details
Particulars | Details |
---|---|
Title |
Fabrication, Inspection And Testing At Manufacturer Works, Safe Transportation To Site, Erection And Testing Of Bottling Unit Of Vdpp Plant At Hwbf, Vadodara.
|
Description |
Fabrication, Inspection And Testing At Manufacturer Works, Safe Transportation To Site, Erection And Testing Of Bottling Unit Of Vdpp Plant At Hwbf, Vadodara.
|
Organisation | Heavy Water Board | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 54000 |
Tender Value | |
Place | Heavy water Board Facilities Vadodara |
Link |
AAAAAAAAAA Login to view |
Start Date | June 03, 2025 20:30 |
End Date |
24/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, manufacture, supply, erection and testing at factory and site of seismically qualified electrically operated overhead cranes in rup, frfcf, kalpakkam
Design, manufacture, supply, erection and testing at factory and site of seismically qualified electrically operated overhead cranes in rup, frfcf, kalpakkam
Read moreConstruction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines including survey, supply of all equipment/mate rials, erection (including civil works), testing and commissioning.
Construction of&#x0d 132/33 kv, 2x50 mva&#x0d gis substation at&#x0d hathi bhata&#x0d (ajmer)&#x0d alongwith&#x0d associated&#x0d transmission&#x0d lines including&#x0d survey, supply&#x0d of all&#x0d equipment/mate&#x0d rials, erection&#x0d (including civil&#x0d works), testing&#x0d and&#x0d commissioning.
Read moreConsultancy services for preparation of feasibility study for development of multi modal logistic park and detailed project reports for external trunk connectivity infrastructure to the multi modal logistic park site at visakhapatnam
Consultancy services for preparation of feasibility study for development of multi modal logistic park and detailed project reports for external trunk connectivity infrastructure to the multi modal logistic park site at visakhapatnam
Read moreFabrication erection and dismantling works at crushing plant diom for two years and extendable for one more year on mutual consent
Fabrication erection and dismantling works at crushing plant diom for two years and extendable for one more year on mutual consent
Read moreWork of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.
Work of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.&#x0d
Read moreJp/b653-000-mp-t-9510/1006 hot tapping works part-a and part-b for revamping of sv stations, gas terminal and kribcho terminal (part-b) at ongc hazira plant
Hot tapping works part-a and part-b for revamping of sv stations, gas terminal and kribcho terminal (part-b) at ongc hazira plant
Read moreCa no.cwe bly/ge (e)/10 of 2025- 2026special repair to bldg no p-338 in b charge, jcos mess (bldg no p-301 and guest room) unit run canteen (bldg no p-27c,p-27e and hs) at rts and depot hempur under ge (east) bareilly
Ca no.cwe bly/ge (e)/10 of 2025- 2026special repair to bldg no p-338 in b charge, jcos mess (bldg no p-301 and guest room) unit run canteen (bldg no p-27c,p-27e and hs) at rts and depot hempur under ge (east) bareilly
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreSurvey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Survey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Read moreSelection of agency for door to door collection, segregation of municipal solid wastefrom each establishment and transportation to the mrf centres or transfer stations orprocessing site in mc fatehabad
Selection of agency for door to door collection, segregation of municipal solid wastefrom each establishment and transportation to the mrf centres or transfer stations orprocessing site in mc fatehabad
Read moreof your Industry type