Tender Details

Particulars Details
Title
Fabrication, Dismantling And Erection Of H2 So4 Pipelines Of Sizes Up To 300 Nb By Tig Welding In So2 Or Dcda Acid Plant.
Description
Fabrication, Dismantling And Erection Of H2 So4 Pipelines Of Sizes Up To 300 Nb By Tig Welding In So2 Or Dcda Acid Plant.
Organisation The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department
Tender Id 2025_FACT_853455_1
Reference
Number
3012/2024-2025/E31216
Tender Fee 0
EMD 12000
Tender Value -
Place FACT Udyogamandal
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=897228

Start Date March 18, 2025 19:30
End Date
Expired 02/04/2025

Expired 559 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Replacement of cooling water pipelines of unit 1 machine with seamless carbon steel pipes at idamalayar power house including dismantling of existing pipelines supply fabrication erection installation testing commissioning

Replacement of cooling water pipelines of unit 1 machine with seamless carbon steel pipes at idamalayar power house including dismantling of existing pipelines supply fabrication erection installation testing commissioning

Read more
Dismantling, fabrication and erection of light structurals, pipelines, valves etc (outside of mill area) at energy mechanical in tnpl unit-1

Dismantling, fabrication and erection of light structurals, pipelines, valves etc (outside of mill area) at energy mechanical in tnpl unit-1

Read more
Dismantling, fabrication and erection of structurals, pipelines and valves in pulper building, main building in dip at pulp mill mechanical in tnpl unit i

Dismantling, fabrication and erection of structurals, pipelines and valves in pulper building, main building in dip at pulp mill mechanical in tnpl unit i

Read more
Dismantling, fabrication and erection of corroded structurals, equipment and repairing of overhead pipe line in clo2 plant, vam plant, so2 plant, cl2 plant and oxygen plant#1and 2 at pulp mill mech

Dismantling, fabrication and erection of corroded structurals, equipment and repairing of overhead pipe line in clo2 plant, vam plant, so2 plant, cl2 plant and oxygen plant#1and 2 at pulp mill mech

Read more
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27

Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27

Read more
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil

Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil

Read more
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Hammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by

Hammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by

Read more
Fabrication, dismantling and erection of pipelines in so2/dcda acid plant and pollution control area

Fabrication, dismantling and erection of pipelines in so2/dcda acid plant and pollution control area

Read more
Fabrication, dismantling and erection of pipelines in so2 or dcda acid plant and pollution control area.

Fabrication, dismantling and erection of pipelines in so2 or dcda acid plant and pollution control area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise