| Particulars | Details |
|---|---|
| Title |
Material Handling, Cleaning Of Components Maintenance Of Equipments And Preparation And Removal Of Scaffolding During Mta 25 At Hwpk Site.
|
| Description |
Material Handling, Cleaning Of Components Maintenance Of Equipments And Preparation And Removal Of Scaffolding During Mta 25 At Hwpk Site.
|
| Organisation | Heavy Water Board | Central Govt. Ministry/Department |
| Tender Id | 2025_HWB_851203_1 |
|
Reference Number |
HWPK/MECH/MTA-25/439 |
| Tender Fee | 0 |
| EMD | 1.33 Lakh |
| Tender Value | - |
| Place | HWPK PLANT SITE |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=894782 |
| Start Date | March 06, 2025 15:30 |
| End Date |
Expired
15/03/2025
Expired 578 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreSite preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Read moreNon-destructive examination of various equipments and process piping at hwpk site during mta-2025
Non-destructive examination of various equipments and process piping at hwpk site during mta-2025
Read moreRemoval, shifting, re installation of valves and maintenance of flange joints at hwpk site during mta-2025
Removal, shifting, re installation of valves and maintenance of flange joints at hwpk site during mta-2025
Read moreMaintenance and testing of heat exchangers at hwpk site during mta 2025
Maintenance and testing of heat exchangers at hwpk site during mta 2025
Read moreMaintenance and testing of plug valves and sealant gate valves during mta-25 at hwpk site.
Maintenance and testing of plug valves and sealant gate valves during mta-25 at hwpk site.
Read moreRemoval, shifting, re- installation of control valves and actuators (pneumatic and electric motor operated) of on-off valves at hwpk site during mta-2025.
Removal, shifting, re- installation of control valves and actuators (pneumatic and electric motor operated) of on-off valves at hwpk site during mta-2025.
Read moreScaffolding work during mta at heavy water plant manuguru
Erection and removal of temporary platforms (scaffoldings) during mta-2024 in main plant of hwpm
Read moreMaintenance contract for insulation work on towers, tanks, exchangers and pipelines etc during mta-25 at hwpk site.
Maintenance contract for insulation work on towers, tanks, exchangers and pipelines etc during mta-25 at hwpk site.
Read moreof your Industry type