Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Boundary Wall And Allied Works At Gobindapur 1st And 2nd Tubewell Site Of Public Water Supply Schemes In Jhargram Block Within Jhargram District Under Jhargram Division P.H.E Dte.
|
| Description |
Construction Of Boundary Wall And Allied Works At Gobindapur 1st And 2nd Tubewell Site Of Public Water Supply Schemes In Jhargram Block Within Jhargram District Under Jhargram Division P.H.E Dte.
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2025_PHED_811385_1 |
|
Reference Number |
eNIT No. 36 of EE/JHD of 2023-24 (2nd Call) |
| Tender Fee | 0 |
| EMD | 24973 |
| Tender Value | - |
| Place | Jhargram |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1804157 |
| Start Date | February 10, 2025 16:30 |
| End Date |
Expired
10/03/2025
Expired 584 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation of 2 nos clustered light duty tubewell (solar) (5hp) schemes (9 nos) at kodal basti and north poro mouzas under kalchini block under core sector program
Installation of 2 nos clustered light duty tubewell (solar) (5hp) schemes (9 nos) at kodal basti and north poro mouzas under kalchini block of alipurduar district under jalpaiguri (a-i) division under core sector program.
Read moreDrilling and installation of 4 cluster (12 nos installations) light duty tubewell (solar) schemes (5hp) including solar pv system at different mouzas under alipurduar-i block under core sector program
Drilling and installation of 4 cluster (12 nos installations) light duty tubewells (solar) schemes (5hp) including solar pv system at different mouzas under alipurduar-i block of alipurduar district under jalpaiguri (a-i) division.
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreConstruction of boundary wall and allied works at burimol, rajband, bhaudi , metial 1st and 2nd tubewell site of public water supply schemes in jhargram block within jhargram district under jhargram division p.h.e dte.
Construction of boundary wall and allied works at burimol, rajband, bhaudi , metial 1st and 2nd tubewell site of public water supply schemes in jhargram block within jhargram district under jhargram division p.h.e dte.
Read moreConstruction of boundary wall and allied works at darukuli, pindrakuli, khas jangal, mantipa 1st and 2nd tubewell site of public water supply schemes in jhargram block within jhargram district under jhargram division p.h.e dte.
Construction of boundary wall and allied works at darukuli, pindrakuli, khas jangal, mantipa 1st and 2nd tubewell site of public water supply schemes in jhargram block within jhargram district under jhargram division p.h.e dte.
Read moreRepairing of staff quarter at raghunathpur within phe complex under jhargram sub-division, jhargram division p.h.e, dte.
Repairing of staff quarter at raghunathpur within phe complex under jhargram sub-division, jhargram division p.h.e, dte.
Read moreExtention distribution pipe line for amlachati and adjoining moujas pwss in jhargram block within jhargram district under jhargram division p.h.e dte.
Extention distribution pipe line for amlachati and adjoining moujas pwss in jhargram block within jhargram district under jhargram division p.h.e dte.
Read moreConstruction of boundary wall allied works at 2nd tube well site of uttar barsole and its adjoining mouzas pipe water supply scheme within jamboni block under jhargram rws sub division within jhargram division. p.h.e. dt total length 50 mtr, colum
Construction of boundary wall allied works at 2nd tube well site of uttar barsole and its adjoining mouzas pipe water supply scheme within jamboni block under jhargram rws sub division within jhargram division. p.h.e. dt total length 50 mtr, colum
Read moreRe-laying of distribution pipeline of chilkigarh i, ii, iii and iv schemes due to widening and strengthening of road by jhargram division p.w.d under jhargram r.w.s sub-division within jhargram division,p.h.e. dte.
Re-laying of distribution pipeline of chilkigarh i, ii, iii and iv schemes due to widening and strengthening of road by jhargram division p.w.d under jhargram r.w.s sub-division within jhargram division,p.h.e. dte.
Read moreLaying of extention distribution pipe line for rautarapur and adjoining moujas pwss in jhargram block within jhargram district under jhargram division p.h.e dte.
Laying of extention distribution pipe line for rautarapur and adjoining moujas pwss in jhargram block within jhargram district under jhargram division p.h.e dte.
Read moreof your Industry type