Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Infrastructure Development For Collection Of Dry Fly Ash From Three Pulverized Coal Fired Boilers And Utilization Of Fly Ash Through Operating The System On Boot Mode
|
| Description |
Infrastructure Development For Collection Of Dry Fly Ash From Three Pulverized Coal Fired Boilers And Utilization Of Fly Ash Through Operating The System On Boot Mode
|
| Organisation | Bokaro Power Supply Company (P) Limited | Public Sector Undertakings |
| Tender Id | 2024_BPSCL_214014_1 |
|
Reference Number |
24-25/EOI-003 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Power Plant, BPSCL, Bokaro Steel City |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=236145 |
| Start Date | November 09, 2024 23:30 |
| End Date |
Expired
13/12/2024
Expired 670 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Utilization of 3.86 lmt metric tonne dry fly ash
Utilization of 3.86 lmt metric tonne dry fly ash to all other users of dry fly ash except small scale bricks blocks tiles fiber sheet pipes sintered and cold bonded aggregates from gatp goindwal sahib.
Read moreSale of dry fly ash from silo of 1x660 mw, panki thermal
Sale of dry fly ash from silo of 1x660 mw, panki thermal power project, uprvunl, panki, kanpur
Read moreCeramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Read moreAugmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)
Augmentation of dry fly ash
 transportation system
 at
 barauni thermal power station, stage-ii
 (2x250 mw)
Read moreHandling and transport on lumpsum basis - transportation of conditioned fly ash to gorbi mines from ntpc vindhyachal through rcr mode
Handling and transport on lumpsum basis - transportation of conditioned fly ash to gorbi mines from ntpc vindhyachal through rcr mode
Read moreFly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Read moreEngagement of selling agency for disposal of dry fly ash, gypsum, cenosphere, pond/bottom ash, coal mill rejects etc and all categories of surplus materials, scrap, etc for three (03) years
Engagement of selling agency for disposal of dry fly ash, gypsum, cenosphere, pond/bottom ash, coal mill rejects etc and all categories of surplus materials, scrap, etc for three (03) years
Read moreEoi for infrastructure development for collection of dry fly ash from three pulverized coal fired boilers and utilization of fly ash through operating the system on boot mode
Eoi for infrastructure development for collection of dry fly ash from three pulverized coal fired boilers and utilization of fly ash through operating the system on boot mode
Read moreInvitation for expression of interest (eoi) for infrastructure development for increasing ash evacuation efficiency of existing ash handling system of rtps and utilization of fly ash through operating the system on boot mode basis
Invitation for expression of interest (eoi) for infrastructure
 development for increasing ash evacuation efficiency of
 existing ash handling system of rtps and utilization of fly
 ash through operating the system on boot mode basis
Read moreof your Industry type