Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nabard Ridf Xxix Infrastructural Development Works At Various Padasekharams
|
| Description |
Nabard Ridf Xxix Infrastructural&Amp#X0d
Development Works At Various Padasekharams&Amp#X0d
Of Cherthala Lac Part4 Cherthala South&Amp#X0d
Panchayath Various Padam Cherthala South&Amp#X0d
Panchayath Various Padam General Civil Work
|
| Organisation | Department of Agriculture | State Govt. and UT |
| Tender Id | 2024_AGRI_688030_1 |
|
Reference Number |
AGRI/DOA/EST/71/2024/S |
| Tender Fee | 8270 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Cherthala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1070652 |
| Start Date | August 28, 2024 17:30 |
| End Date |
Expired
18/09/2024
Expired 738 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreDesign, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreNabard-ridf xxix infrastructural development works at various padasekharams
Nabard-nabard-ridf xxix&#x0d infrastructural development works at various&#x0d padasekharams of cherthala lac part2-&#x0d muhamma panchayath-muhamma panchayath-&#x0d general civil work
Read moreNabard--ridf xxix infrastructural development works at various padasekharams
Nabard--ridf xxix infrastructural development works at various padasekharams&#x0d of cherthala lac part3-thanneermukkam panchayath-thanneermukkam&#x0d panchayath-general civil work
Read moreNabard ridf xxix infrastructural development works of various padasekharams in vayalar gp inalappuzha district phase ii retender
Deepening of thodu and chals, raising of bund
Read moreNabard-ridf xxix infrastructural development works at various padasekharams of cherthala lac part1-cherthala municipality -cherthala municipality
Nabard-ridf xxix infrastructural&#x0d development works at various padasekharams&#x0d of cherthala lac part1-cherthala&#x0d municipality -cherthala municipality-&#x0d general civil work
Read moreNabard- ridf xxix infrastructural development works at various padasekharams of cherthala lac- mambala padam phase ii -general civil work
Nabard- ridf xxix infrastructural development works at various padasekharams of cherthala lac- mambala padam phase ii -general civil work
Read moreof your Industry type