Tender Details

Particulars Details
Title
Construction Of Distributary Channel To Youkma Akchamal For Lift Irrigation Scheme Sodth. Under The Project Of Completion Of Balance Work Of Lift Irrigation Scheme Sodth
Description
Construction Of Distributary Channel To Youkma Akchamal For Lift Irrigation Scheme Sodth. Under The Project Of Completion Of Balance Work Of Lift Irrigation Scheme Sodth
Organisation Public Works Department | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 210
EMD 40900
Tender Value
Place Kargil
Link

AAAAAAAAAA

Login to view
Start Date June 18, 2025 20:30
End Date

30/06/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb fund distt jalandhar

Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structure) with 5 year maintenance under nabard loan/mc/mb funds distt jalandhar

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Rehabilitation and modernization of jhanjharpur branch canal from km 0.00 to km 42.06 of western kosi irrigation scheme under bwsimp

Rehabilitation and modernization of jhanjharpur branch canal from km 0.00 to km 42.06 of western kosi irrigation scheme under bwsimp

Read more
Construction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur-- sitc of dg set

Construction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur. --sitc of dg set

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Const of 1 no 66kv line bay at s/s jasterwal under rdss

Construction of foundations for 1 no. 66 kv line bay at 66 kv s/s jasterwal (under ds sub urban circle amritsar) (twl no. 95/bz/2023-24/annex.e) under rdss scheme

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise