Tender Details
Particulars | Details |
---|---|
Title |
Synthetic Enamel Painting For All Type Houses In Panjab University Campus, Sector 14 And 25, Chandigarh.
|
Description |
Synthetic Enamel Painting For All Type Houses In Panjab University Campus, Sector 14 And 25, Chandigarh.
|
Organisation | Panjab University | State Govt. and UT |
Tender Id | 2025_PU_84664_1 |
Reference Number |
6650/EE/Mtc |
Tender Fee | 0 |
EMD | 30000 |
Tender Value | |
Place | Panjab University Campus, Sector-14 and 25, Chd |
Link | https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=104046 |
Start Date | February 11, 2025 17:30 |
End Date |
04/03/2025 ( Expired 72 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreSewerage scheme for teachers campus of dr. ram manohar lohia awadh university ayodhya
Surveying soil investigation design and supply of all materials labour tp etc complete required for completion of following works of sewerage scheme for teachers campus of dr ram manohar lohia awadh university ayodhya on &#x0d turnkey basis
Read moreSewerage scheme for administrative campus of dr. ram manohar lohia awadh university ayodhya
Surveying soil investigation design and supply of all materials labour tp etc complete required for completion of following works of sewerage scheme for administrative campus of dr ram manohar lohia awadh university ayodhyanon &#x0d turnkey basis
Read moreImplementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Read moreEstimate for providing and fixing of sluice gate 600mm x 600mm complete in all respects to control the storm water near 25 darya drain.
Estimate for providing and fixing of sluice gate 600mm x 600mm complete in all respects to control the storm water near 25 darya drain.
Read more621 strategic planning/dop/25-26
Strategic planning unit for the department of power government of west bengal in the strategic planning and transformation of the west bengal power sector
Read moreOil bound distempering painting of 100 no houses t1 to t6 exterior paint of 64 no. houses t5 sector 3 and addition of toilet adjoining to house no 2 t8 in existing area of bbmb colony talwara township during the year 2025 26
Oil bound distempering painting of 100 no houses t1 to t6 exterior paint of 64 no. houses t5 sector 3 and addition of toilet adjoining to house no 2 t8 in existing area of bbmb colony talwara township during the year 2025 26
Read moreBiennial rate contract for online sealing of leakages in various valve glands, valve bonnet pipe flange, pipe, etc. of boiler and turbine areas of all thermal power stations of dvc.
Biennial rate contract for online sealing of leakages in various valve glands, valve bonnet pipe flange, pipe, etc. of boiler and turbine areas of all thermal power stations of dvc.
Read moreTender for supply installation and operation of vending machines in iit dharwad campus
Tender for supply installation and operation of vending machines in iit dharwad campus
Read morePrequalification of cost audit firms for conducting cost audit of nfls nangal bathinda panipat and vijaipur i and ii units and consolidation of cost audit reports of all the five units for the year 25-26 26-27 27-28.
Prequalification of cost audit firms for conducting cost audit of nfls nangal bathinda panipat and vijaipur i and ii units and consolidation of cost audit reports of all the five units for the year 25-26 26-27 27-28.
Read moreof your Industry type