Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Concrete Road From Mustafa Molla House To Rajjak Molla Via Sk. Monirul House With Pilling Works Under Tk Ii Gp Under Uluberia Ii Dev. Block
|
Description |
Construction Of Concrete Road From Mustafa Molla House To Rajjak Molla Via Sk. Monirul House With Pilling Works Under Tk Ii Gp Under Uluberia Ii Dev. Block
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id | 2024_ZPHD_657810_1 |
Reference Number |
HWZP/ULU-II/PS/NIET-39/23-24 |
Tender Fee | 0 |
EMD | 14650 |
Tender Value | |
Place | Tehatta, Rajapur, Howrah |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1423509 |
Start Date | February 01, 2024 00:00 |
End Date |
15/02/2024 ( Expired 459 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreAAAAAAAAAA
Login to viewBalance pipeline laying, road repair with allied works under proposed ground water based asuti i asuti ii and chatta gp pwss to accommodate fhtc in thakurpukur-maheshtala block under swd - i, p.h.e. dte district south 24 parganas.
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreZone no. 03, ward no. 13, construction of rcc drain and culvert from sunil singh ji house via kaushlesh dwivedi ji house to chunnu shrivastav ji house.
Zone no. 03, ward no. 13, construction of rcc drain and culvert from sunil singh ji house via kaushlesh dwivedi ji house to chunnu shrivastav ji house.
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.4
Different works related sinking of additionaltube-wells interconnection fhtcs construction of pump house boundary wall protection works approach road etc. with 09 nos.pwss of manteswer block of durgapur sub divn under burdwan divn phe dte.&#x0d &#x0d &#x0d
Read moreCement concrete work on road from house no. 29/b/s-2 dilip jaisawal house to chhtrasal school main road to radha krishna mandir house no. 48/d/s-2 at scheme no. 78 in ward no. 32 under zone no. 07
Cement concrete work on road from house no. 29/b/s-2 dilip jaisawal house to chhtrasal school main road to radha krishna mandir house no. 48/d/s-2 at scheme no. 78 in ward no. 32 under zone no. 07
Read moreof your Industry type