Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Carbon Fibre Reinforced Plastic Support Rods With Ss End Fittings, Indium Foils And Superconducting Switch For Cryogenic Application
|
Description |
Supply Of Carbon Fibre Reinforced Plastic Support Rods With Ss End Fittings, Indium Foils And Superconducting Switch For Cryogenic Application
|
Organisation | Inter University Accelerator Centre | Central Govt. Ministry/Department |
Tender Id | 2024_IUAC_790314_1 |
Reference Number |
IUAC/NIT/16R/SMK/2023-24 |
Tender Fee | 10 |
EMD | 70000 |
Tender Value | |
Place | Inter University Accelerator Centre |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=830697 |
Start Date | January 13, 2024 17:30 |
End Date |
22/01/2024 ( Expired 531 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Read moreProcurement and supply of c-arm (basic, mid end and high end with flat panel detector) machines to various government hospitals / institutions in telangana state under rate contract for a period of 2 years
Procurement and supply of c-arm (basic, mid end and high end with flat panel detector) machines to various government hospitals / institutions in telangana state under rate contract for a period of 2 years
Read moreSupply and installation of monoblock pump and storage tank with all fittings for water supply arrangement at bhopal municipal coorporation headquarter under zone no. 07
Supply and installation of monoblock pump and storage tank with all fittings for water supply arrangement at bhopal municipal coorporation headquarter under zone no. 07
Read moreAll water supply dept. related workshop works ie. repairs of valves, making checknut, rods of sluice valves, welding if nessesaey to ms pipelines etc. with labour charges and required material for annual 2025-26
All water supply dept. related workshop works ie. repairs of valves, making checknut, rods of sluice valves, welding if nessesaey to ms pipelines etc. with labour charges and required material for annual 2025-26
Read moreSupply of 300nb fittings with flanges on both ends for high pressure water pump discharge line of stage i and ii
Supply of 300nb fittings with flanges on both ends for high pressure water pump discharge line of stage i and ii
Read moreSupply, installation and fittings of firefighting system along with related accessories for 5tph rice processing unit at hojai under apart project.
Supply, installation and fittings of firefighting system along with related accessories for 5tph rice processing unit at hojai under apart project.
Read moreSupply and installation of 50 mbps internet leased line connectivity in 79 govt polytechnic colleges across west bengal for three years with cloud hosted centralized management orchestration controller analytics solution with 24x7 support with suitab
Supply and installation of 50 mbps internet leased line connectivity in 79 govt polytechnic colleges across west bengal for three years with cloud hosted centralized management orchestration controller analytics solution with 24x7 support with suitab
Read moreSupply of led light with fittings
Specification for supply of branded 18w led retrofitting lights,72w led street light with complete fittings,150w led flood lights with complete fittings for tower/gantry and 200w led flood lights for substations.
Read moreSupply of 300nb fittings and 90 deg end with flanges on both ends for high pressure water pump discharge line of stage-ii
Supply of 300nb fittings and 90 deg bend with flanges on both ends for high pressure water pump discharge line of stage-ii
Read moreSupply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreof your Industry type