Tender Details

Particulars Details
Title
Establishing Of Blue And Green Infrastructure Project For Distribution Of Treated Waste Water From 7 Mld Stp At Palapitta Park To Fill The Water Bos Ponds Watering To The Plants And To Kudikunta Lake
Description
Establishing Of Blue And Green Infrastructure Project For Distribution Of Treated Waste Water From 7 Mld Stp At Palapitta Park To Fill The Water Bos/Ponds Watering To The Plants, Flora Fauna In The Botanical Garden And In Palapitta Park, Serilingampally To Maintain Their Ecological Balance And (Ii) Distribution Of Treated Waste Water From 7 Mld Stp At Palapitta Park To Kudikuntla Lake To Fill Water Bos/Ponds
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 564351
Reference
Number
EP.No.08/CGM(E)/STP Circle II/B G Infra/7 MLD pitta/2024-25 dt: 21.12.2024
Tender Fee 11800
EMD 5.28 Lakh
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date December 24, 2024 01:29
End Date

07/01/2025 ( Expired 155 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Read more
Preparation of detailed project report dpr and preparation of tender document for tertiary treatment plant of about 50 mld and its allied work related to reuse of treated water in thane municipal corporation area

Preparation of detailed project report dpr and preparation of tender document for tertiary treatment plant of about 50 mld and its allied work related to reuse of treated water in thane municipal corporation area

Read more
Engagement of consultant for the preparation of a comprehensive management plan and feasible network design for the supply of treated water to park/ greens located at various locations within nct of delhi under the jurisdiction of horticulture depart

Engagement of consultant for the preparation of a comprehensive management plan and feasible network design for the supply of treated water to park/ greens located at various locations within nct of delhi under the jurisdiction of horticulture dep...

Read more
For laying and interconnetcion of 400mm x 150 mm distribution pipeline from sanjay nagar oht to sharda temple road, subhaash chandra bose ward zone 7

For laying and interconnetcion of 400mm x 150 mm distribution pipeline from sanjay nagar oht to sharda temple road, subhaash chandra bose ward zone 7

Read more
Manning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33k

Manning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv

Read more
Manning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.

Manning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.

Read more
Sitc of rain gun system with hdpe pipe-line leading to holy shrine and its operation and maintenance for 3 years by using stp treated water

Sitc of rain gun system with hdpe pipe-line leading to holy shrine and its operation and maintenance for 3 years by using stp treated water

Read more
Supply of manpower for operation at 27 mld salem mettur water supply (nangavalli) scheme intake tower and karumalaikoodal booster pumping station for eight months from (01.05.2025 to 31.12.2025)

Supply of manpower for operation at 27 mld salem mettur water supply (nangavalli) scheme intake tower and karumalaikoodal booster pumping station for eight months from (01.05.2025 to 31.12.2025)

Read more
Construction of 1.0 mld stp with green tech aerated wet lands and lake front park development for the main bund at thirumalgiri lake, thirumalgiri (v and m)

Construction of 1.0 mld stp with green tech aerated wet lands and lake front park development for the main bund at thirumalgiri lake, thirumalgiri (v and m).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise