Tender Details

Particulars Details
Title
Repairing/ Rewinding Of Existing 7.5 Hp And 5 Hp Booster Pump And Other Allied Work To Be Carried Out In Cavalry Lane And 8 Cavalry Lane, University Of Delhi
Description
Repairing/ Rewinding Of Existing 7.5 Hp And 5 Hp Booster Pump And Other Allied Work To Be Carried Out In Cavalry Lane And 8 Cavalry Lane, University Of Delhi
Organisation Delhi University | Central Govt. Ministry/Department
Tender Id 2024_DU_816756_1
Reference
Number
CEET-5787
Tender Fee 500
EMD 15075
Tender Value
Place North Campus
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=858328
Start Date July 16, 2024 23:30
End Date

22/07/2024 ( Expired 335 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Read more
Construction work of cc drain in ward number 6 from pramod bairagi house to behind the bus stand, near gillu kabade in the street opposite shiv madia and at other places.

Construction work of cc drain in ward number 6 from pramod bairagi house to behind the bus stand, near gillu kabade in the street opposite shiv madia and at other places.

Read more
Maintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.

Maintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
Ca no ge(u)/chm-30/2025-26 certain repairs to joinery, flooring, wall tiling, false ceiling, wall panelling work etc in ground floor and first floor of command hospital and other various location under age b/r (ch) of ge(u) chandimandir

Ca no ge(u)/chm-30/2025-26 certain repairs to joinery, flooring, wall tiling, false ceiling, wall panelling work etc in ground floor and first floor of command hospital and other various location under age b/r (ch) of ge(u) chandimandir

Read more
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Modification of existing road from both the main gates to control room construction of switchyard fencing stackyard and other allied works at c1-zone 132 kv substation under durgapur area office of wbsetcl

Modification of existing road from both the main gates to control room construction of switchyard fencing stackyard and other allied works at c1-zone 132 kv substation under durgapur area office of wbsetcl

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise