Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Spares For Solenoid Valves For Wet Ash Evacuation And Dense Phase Dry Ash Handling System At Ahp Unit 1 To 6, Sstps, Suratgarh
|
Description |
Supply Of Spares For Solenoid Valves For Wet Ash Evacuation And Dense Phase Dry Ash Handling System At Ahp Unit 1 To 6, Sstps, Suratgarh
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2024_RRVUN_385792_1 |
Reference Number |
TN-MM-1944 |
Tender Fee | 736 |
EMD | 22840 |
Tender Value | |
Place | STPS Suratgarh |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=687271 |
Start Date | March 05, 2024 16:30 |
End Date |
18/03/2024 ( Expired 481 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreProcurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreDesign, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Read moreDesign, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Read moreDesign supply erection installation testing and commissioning of automatic milk pouches stacking collating and conveying system at trichy dairy
Design supply erection installation testing and commissioning of automatic milk pouches stacking collating and conveying system at trichy dairy for the year 2025-26
Read moreCivil works for construction of 02 nos. 33 kv gis bay for m/s medanta noida unit of global health ltd. and m/s aircon system india pvt. ltd., at 400 kv gis s/s sector-123, noida.
Civil works for construction of 02 nos. 33 kv gis bay for m/s medanta noida unit of global health ltd. and m/s aircon system india pvt. ltd., at 400 kv gis s/s sector-123, noida.
Read moreInstallation of coal slurry settling plant (cssp) for unit 1 to 6 and dosing system for existing cssp of unit 7 and 8 chp, mtps
Installation of coal slurry settling plant (cssp) for unit 1 to 6 and dosing system for existing cssp of unit 7 and 8 chp, mtps
Read moreTwo years job contract for operation of entire ash handling plant including electrical, zero liquid discharge and mill rejection system of two nos. 250 mw unit at stps
Two years job contract for operation of entire ash handling plant including electrical, zero liquid discharge and mill rejection system of two nos. 250 mw unit at stps
Read moreReplacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Read moreDosing of chemicals at water purification plant and day to day back wash of filter beds etc. at water purification plant llph under water supply sub division dvc, maithon for two years
Dosing of chemicals at water purification plant and day to day back wash of 
 filter beds etc. at water purification plant llph under water supply sub division 
 dvc, maithon for two years
Read moreof your Industry type