Tender Details

Particulars Details
Title
Construction Of Talawali App. Road (I/C Shifting Of Electric Line And Other Utility Shifting) Length 1.15 Km
Description
Construction Of Talawali App. Road (I/C Shifting Of Electric Line And Other Utility Shifting) Length 1.15 Km
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2025_PWDRB_426185_1
Reference
Number
6(1)/SAC/25-26/INDORE-2/DATE 28.05.2025
Tender Fee 14034
EMD 1.72 Lakh
Tender Value
Place Depalpur
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=503656

Start Date May 31, 2025 15:30
End Date
Expired 09/06/2025

Expired 374 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar

Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar

Read more
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)

Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Outsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9 (phase i) including charkop and mandale depot for three years

Outsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9&amp#x0d (phase i) including charkop and mandale depot for three years

Read more
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Read more
Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads

Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads.

Read more

Construction of school building(g plus1), girls hostel(g plus 2), boys hostel (g plus 2), kitchen and dining, principal quarter, type-ii qtrs -10 nos (g plus 2), type-iii qtrs. - 16 nos (g plus 1), warden residence -2 nos, compound wall, security room, internal cc roads, internal water supply, sanitary installation, drainage, 2 nos. borewell, ug sumps, septic tank, sport facilities and providing internal electrical installations, street lighting, substation equipment, dg sets and fire fighting system including development and bulk services at jhagadia, village - rupaniya, distt. bharuch (gujarat)

Read more
Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)

Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)

Read more
Execution work for shifting of line at village kauriram gola road to janipur on semi turnkey basis in deposit head under electricity distribution division kauriram, gorakhpur.

Execution work for shifting of line at village kauriram gola road to janipur on semi turnkey basis in deposit head under electricity distribution division kauriram, gorakhpur.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise