Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Drilling Of 300/100 Mm Dia 75m Deep Gravel Packed Tube Well
|
| Description |
Drilling Of 300/100 Mm Dia 75m Deep Gravel Packed Tube Well With Hand Pump And Upvc Casing Pipe Blcok Chawarpatha In District Narsinghpur Number Of Tube Wells 12, Type Of Tube Wells Gravel Packed
|
| Organisation | Public Health Engineering- O/o Engineer In Chief | State Govt. and UT |
| Tender Id | 2024_PHED_339102_1 |
|
Reference Number |
268/ProCell/ EEPHED/2023-24/Narsinghpur |
| Tender Fee | 2295 |
| EMD | 36240 |
| Tender Value | |
| Place | chawarpatha |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=400841 |
| Start Date | March 05, 2024 18:30 |
| End Date |
Expired
15/03/2024
Expired 831 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
R/m of wss tahliwal in tehsil haroli distt. una(hp).(sh drilling, lowering of assembly development of 200 mm dia borewell ( mini t/well) 80 mtrs deep at tahliwal for fire fighting arrangement)
R/m of wss tahliwal in tehsil haroli distt. una(hp).(sh drilling, lowering of assembly development of 200 mm dia borewell ( mini t/well) 80 mtrs deep at tahliwal for fire fighting arrangement)
Read moreAnnual rate contract for the work of construction of 125 mm dia tube well, for hand pumps complete job in various villages/ towns of panchayat samiti aklera district jhalawar
Annual rate contract for the work of construction of 125 mm dia tube well, for hand pumps complete job in various villages/ towns of panchayat samiti aklera district jhalawar
Read moreMajor works water supply scheme south tripura replacement 1 deep tube well including drilling development erw pipes pea gravels pump house staging column assembly pipeline reconnection works at ongc gajalia nabagram gp satchand rd block during 26-27
Major works water supply scheme south tripura replacement 1 deep tube well including drilling development erw pipes pea gravels pump house staging column assembly pipeline reconnection works at ongc gajalia nabagram gp satchand rd block during 26-27
Read moreConstruction of tube well in jalkari bai smarak, panchsheel nagar, ajmer
Construction of tube well in jalkari bai smarak, panchsheel nagar, ajmer
Read moreConstruction of 200mm x 165mm dia x 225 mtrs deep hydtw with extra deep well hand pump platform installation of submersible motor pump and water supply arrangements with 4 x 1000 by 2 x 2000 ltrs hdpe water tank over platform pump handhydrent
Construction of 200mm x 165mm dia x 225 mtrs deep hydtw with extra deep well hand pump platform installation of submersible motor pump and water supply arrangements with 4 x 1000 by 2 x 2000 ltrs hdpe water tank over platform pump handhydrent
Read moreDrilling and development of 01 no 150 x 150 mm dia sbdtw with contractors mini rig at rgm hospital within the jurisdiction of dws sub-division, kailashahar 2026-27
Drilling and development of 01 no 150 x 150 mm dia sbdtw with contractors mini rig at rgm hospital within the jurisdiction of dws sub-division, kailashahar 2026-27
Read moreReplacement of damaged 65 mm dia air release valves at intake-i, ii and iii sitlee.
Replacement of damaged 65 mm dia air release valves at intake-i, ii and iii sitlee.
Read moreDrilling of 8 inch dia 1 no of borewell for installation of submersible and development of tanker filling point with drainage facilities at 203 army aviation squadron at spituk.
Drilling of 8 inch dia 1 no of borewell for installation of submersible and development of tanker filling point with drainage facilities at 203 army aviation squadron at spituk.
Read moreProviding, laying and compaction of wbm 75 mm thick (in two layers), wbm 100 mm thick, sand blanketing 30 mm thick, ilcb 80 mm thick of m-50 gr concrete and edge block with pcc m 30 gr concrete bet km 44.180 to km 52.000 on lungro gg-damteng-yangts
Providing, laying and compaction of wbm 75 mm thick (in two layers), wbm 100 mm thick, sand blanketing 30 mm thick, ilcb 80 mm thick of m-50 gr concrete and edge block with pcc m 30 gr concrete bet km 44.180 to km 52.000 on lungro gg-damteng-yangts
Read moreDrilling of 10 nos of boreholes with casing (non-coring )150 mm diameter with lowering and casing of pipes from surface to xiii/xiv seam is urgently required at kenduiadh colliery under p.b area
Drilling of 10 nos of boreholes
 with casing (non-coring )150
 mm diameter with lowering and
 casing of pipes from surface to
 xiii/xiv seam is urgently
 required at kenduiadh colliery
 under p.b area
Read moreof your Industry type