Tender Details
Particulars | Details |
---|---|
Title |
Requirement Of Manpower Of Tree Branch Cutting, Bush Cleaning Above And Beneath The Lt/Ht Conductor From Kuju Substation To Topa Main Substation, Mines, Colonies Etc. Of Topa Project Under Kuju Area.
|
Description |
Requirement Of Manpower Of Tree Branch Cutting, Bush Cleaning Above And Beneath The Lt/Ht Conductor From Kuju Substation To Topa Main Substation, Mines, Colonies Etc. Of Topa Project Under Kuju Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_334401_1 |
Reference Number |
GM (K)/EnM/eTender/25-26/26 |
Tender Fee | 0 |
EMD | 3800 |
Tender Value | |
Place | GM UNIT KUJU |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346654 |
Start Date | April 23, 2025 00:25 |
End Date |
03/05/2025 ( Expired 34 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Testing and calibration for 1 time annually of all ht equipment and electrical installed at substation and mines at topa project under kuju area.
Testing and calibration for 1 time annually of all ht equipment and electrical installed at substation and mines at topa project under kuju area.
Read moreCleaning sludge and garbage from surface drain and bush cutting around pit premises,bc incline and substation etc and widening and deepening of jore near kamalpur mouza, beside oc patch and bharatchak mouza for monsoon preparation for fy 25-26 of
Cleaning sludge and garbage from surface drain and bush cutting around pit premises,bc incline and substation etc. and widening and deepening of jore near kamalpur mouza, beside oc patch and bharatchak mouza for monsoon preparation for fy 25-26 of
Read moreDismantling and erection of tilted and damaged pole and painting of poles of ht overhead line from kuju substation to pundi substation at pundi project under kuju area.
Dismantling and erection of tilted and damaged pole and painting of poles of ht overhead line from kuju substation to pundi substation at pundi project under kuju area.
Read moreBush cutting, tree trimming and uprooting of grass in and arounf sub station (10 mva/5 mva, various tss) and underneath over headlines (ht -33, 11 , 3.3 kv ) and lt oh lines for safety and prive maintenance in the upcoming monsoon under ashok oc
Bush cutting, tree trimming and uprooting of grass in and arounf sub station (10 mva/5 mva, various tss) and underneath over headlines (ht -33, 11 , 3.3 kv ) and lt oh lines for safety and prive maintenance in the upcoming monsoon under ashok oc
Read moreTrimming of tree branches, cutting of bushes, clearing of vegetation, etc. before the onof monsoon around lt/ht power line for uninterrupted power supply and shadow-free lighting under township of rajrappa area
Trimming of tree branches, cutting of bushes, clearing of vegetation, etc. before the onof monsoon around lt/ht power line for uninterrupted power supply and shadow-free lighting under township of rajrappa area
Read moreRequirement of manpower of tree branch cutting, bush cleaning above and beneath the lt/ht conductor from kuju substation to topa main substation, mines, colonies etc. of topa project under kuju area.
Requirement of manpower of tree branch cutting, bush cleaning above and beneath the lt/ht conductor from kuju substation to topa main substation, mines, colonies etc. of topa project under kuju area.
Read moreCleaning of existing garland drain of length 1360.00 mt and cutting of new garland drain of length 1401 mt at different locations in mines for monsoon preparation work under karma project of kuju area.
Cleaning of existing garland drain of length 1360.00 mt and cutting of new garland drain of length 1401 mt at different locations in mines for monsoon preparation work under karma project of kuju area.
Read moreInstallation of lightning arrester at all substations, mines premises, pump stations, etc. of topa ocp under kuju area.
Installation of lightning arrester at all substations, mines premises, pump stations, etc. of topa ocp under kuju area.
Read moreCleaning of existing garland drain of length 950.00 mt and cutting of new garland drain of length 2070.00 mt at different locations in mines for monsoon preparation work under topa project of kuju area.
Cleaning of existing garland drain of length 950.00 mt and cutting of new garland drain of length 2070.00 mt at different locations in mines for monsoon preparation work under topa project of kuju area.
Read moreSupply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Read moreof your Industry type