Tender Details
Particulars | Details |
---|---|
Title |
Nanded Division: Mudkhed Adilabad Section: Supply And Stacking Of 50 Mm Gauge Hard And Durable Machine Crushed Stone Ballast At Himayatnagar (Hem) Ballast Depot And Loading The Same Into Hopper/Traffic Ballast Wagon By Mechanical Means Under Aden/Ned S Jurisdiction For Completion Period 27 (Twenty Seven Months ) ( Including (03)three Months Mobilization Period).
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76349740 |
Reference Number |
T-202425-2-038 |
Tender Fee | 0 |
EMD | 6.75 Lakh |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76349740/viewNitPdf_4649311.pdf |
Start Date | July 26, 2024 00:16 |
End Date |
19/08/2024 ( Expired 268 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Gtl division: renigunta-gooty section-supply and stacking of 50 mm gauge hard and durable machine crushed stone ballast at gooty depot and loading the same into hoppers/traffic ballast wagons by mechanical means (2,25,000 cum)
For complete deion and other details, please refer to tender
Read moreGtl division: supplying and stacking of 50 mm gauge machine crushed hard and durable stone ballast to railway s specifications and loading the same into railway s hoppers/wagons at zangalapalli ballast depot under den/west/gtl jurisdiction. (216000 cum) (two pocket system)
For complete deion and other details, please refer to tender
Read moreProposed supplying and stacking of machine crushed ballast from outside quarry as per revised ballast specification of june 2016 and loading the same into the ballast hoppers by mechanical means at bhandak depot under aden ballarshah sub-division (qty.84750.218 m3)
For complete deion and other details, please refer to tender
Read moreSecunderabad division-bpq-kzj section:- supply, stacking of 50mm gauge hard and durable machine crushed stone ballast to railway s specification at ballast depot at hasanparti station and loading the same into railway hoppers/traffic ballast wagons by mechanical means.(qty ---1,00,000cum)
For complete deion and other details, please refer to tender
Read moreSupply & stacking of 65 mm gauge machine crushed stone ballast & loading in to hopper s / bob n wagon s by mechanical means at khandwa ballast depot. quantity = 40000 m3.
For complete deion and other details, please refer to tender
Read moreSupply & stacking of 65 mm gauge machine crushed stone ballast & loading in to hopper s / bob n wagon s by mechanical means at savada ballast depot. quantity = 50000 m3.
For complete deion and other details, please refer to tender
Read morePiplod depot:-manufacturing, supply and stacking of 50 mm size machine crushed track ballast at depot and loading the same into hopper. (1,52,687 cum).
For complete deion and other details, please refer to tender
Read moreSecunderabad division-bpq-kzj section:- sw-i: - supply, stacking of 50mm gauge hard and durable machine crushed stone ballast to railway s specification at ballast depot at sirpur town station and loading the same into railway hoppers/traffic ballast wagons by mechanical means. (qty---1,00,000cum) sw-ii:-sirpur town station:-i) provision of new ballast siding. ii) provision of formation, approach road, yard drain, and buffer end for ballast siding.
For complete deion and other details, please refer to tender
Read moreSecunderabad -dhone section: gollapalli ballast depot: supplying and stacking of 50mm gauge hard and durable machine crushed stone ballast to railway s specifications at gollapalli ballast depot (depot collection) and loading the same in to railway hoppers / traffic ballast wagons by mechanical means.(qty:52200 cum)
For complete deion and other details, please refer to tender
Read moreSupply and stacking of 40,000 cum machine crushed track ballast as per railway s specification at kantabanji depot from outside railway land/quarry and loading into railway s wagons under the jurisdiction of aden/kantabanji of sambalpur division(period of completion: 12 months excluding monsoon period).
For complete deion and other details, please refer to tender
Read moreof your Industry type