Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of New Foot Bridge Chute Fall And Spill Channel After Dismantling Of Already Existing Spill Way Foot Bridge And E And M Work On Kerwan Dam.
|
| Description |
Construction Of New Foot Bridge Chute Fall And Spill Channel After Dismantling Of Already Existing Spill Way Foot Bridge And E And M Work On Kerwan Dam.
|
| Organisation | Engineer-in-Chief - Water Resources Department | State Govt. and UT |
| Tender Id | 2026_WRD_473814_1 |
|
Reference Number |
1197/2025-26/Einc/Etendering/ dt. 07-01-2026 |
| Tender Fee | 31180 |
| EMD | 10 Lakh |
| Tender Value | - |
| Place | Bhopal |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=557501 |
| Start Date | January 12, 2026 21:30 |
| End Date |
Expired
27/01/2026
Expired 258 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of fall, both side of protection wall in spill channel of barkheda dam
Construction of fall, both side of protection wall in spill channel of barkheda dam
Read moreSale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis
Sale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis
Read moreConstruction of box calvert at spill channel of fatehpur dam.
Construction of box calvert at spill channel of fatehpur dam.
Read moreEpoxy painting after sand blasting on spill way gates of saddle dam, kalagarh
Epoxy painting after sand blasting on spill way gates of saddle dam, kalagarh
Read moreRaising of parapets including allied works at spill channel between fall no 2 and fall no 3 chep iii
Same as per enit
Read moreRaising of parapets including allied works at spill channel between fall no. 2 and fall no. 3 chep-iii
Raising of parapets including allied works at spill channel between fall no. 2 and fall no. 3 chep-iii
Read moreRemoval of rcc spun pipe along the approach path of durbal foot bridge over flood spill channel at rd 8770m.
Removal of rcc spun pipe along the approach path of durbal foot bridge over flood spill channel at rd 8770m.
Read moreRemoval of rcc spun pipe along the approach path of durbal foot bridge over flood spill channel at rd 8770m
Removal of rcc spun pipe along the approach path of durbal foot bridge over flood spill channel at rd 8770m
Read moreConstruction of high level bridge at near rd 850m of sajali spill channel and approach road from keolari village to sajali dam.
Construction of high level bridge at near rd 850m of sajali spill channel and approach road from keolari village to sajali dam.
Read moreof your Industry type