Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Urine Test Strip,Urine Test Strip,Blood Sample Collection Tubes,Blood Sample Collection Tubes,Blood
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/5280161 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 22, 2024 18:02 |
| End Date |
Expired
04/09/2024
Expired 767 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | A.J. Enterprises | Make : Biohall Model : BLS.2200.01 | 03-09-2024 20:46:17 | N/A | Evaluated |
| 2 | Biosci Health care | Make : Model : | 04-09-2024 12:56:41 | MSE | Evaluated |
| 3 | BIOWICK HEALTHCARE PRIVATE LIMITED | Make : BIOWICK HEALTHCARE Model : Urine Strip 2P | 23-08-2024 20:11:40 | MSE | Evaluated |
| 4 | LORD'S MARK INDUSTRIES LIMITED | Make : LORDSMED Model : LORDSMED | 29-08-2024 15:26:27 | MSE | Evaluated |
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreDengue elisa test kit,urine test strip,blood sample collection tubes,blood sample collection tubes,
Read more
Urine culture bottle (v2),blood sample collection tubes,blood sample collection tubes,blood sample
Read more
Urine culture bottle (v2),blood sample collection tubes,blood sample collection tubes,blood sample
Read more
of your Industry type