Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Drb At Km 1.620 Of Makanpur Minor Under Mgc Project Stage Ii Distt. Amroha Lot 35
|
Description |
Construction Of Drb At Km 1.620 Of Makanpur Minor Under Mgc Project Stage Ii Distt. Amroha Lot 35
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPIDC_828786_1 |
Reference Number |
01/EE/23-24 LOT 35 |
Tender Fee | 1244 |
EMD | 54000 |
Tender Value | |
Place | MGCCD4 AMROHA |
Link | https://etender.up.nic.in |
Start Date | August 12, 2023 15:30 |
End Date |
18/08/2023 ( Expired 635 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreReconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreConstruction of c.c. and bt road balance road work at different ward, amarwara under balance amount of mmas ii
Construction of c.c. and bt road balance road work at different ward, amarwara under balance amount of mmas ii
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreof your Industry type