Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Pimpalgaon To Ladaj Road Vr 19 Km 0/00 To 4/00 In Taluka Bramhapuri Distt Chandrapur (Total Length 4.00km)
|
| Description |
Construction Of Pimpalgaon To Ladaj Road Vr 19 Km 0/00 To 4/00 In Taluka Bramhapuri Distt Chandrapur (Total Length 4.00km)
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_PWR_949997_1 |
|
Reference Number |
CHN/NAGBHID/01-21/OT/2023-24 |
| Tender Fee | 1180 |
| EMD | 1.32 Lakh |
| Tender Value | |
| Place | Chandrapur |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | October 04, 2023 00:10 |
| End Date |
Expired
10/10/2023
Expired 981 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of various road under pmgsy-iv batch-1 in halol taluka dist. panchmahal total 4 roads, 4.20 km
Construction of various road under pmgsy-iv batch-1 in halol taluka dist. panchmahal total 4 roads, 4.20 km
Read moreConstruction of various road under pmgsy iv batch 1 in kalol taluka dist. panchmahal total 3 roads, 5.740 km
Construction of various road under pmgsy iv batch 1
 in kalol taluka dist. panchmahal total 3 roads, 5.740 km
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of c.c. drain at.-warud mhasala vr.14 road ch.no.1/000 to 2/100 taluka- district- wardha
Construction of c.c. drain at.-warud mhasala vr.14 road ch.no.1/000 to 2/100 taluka- district- wardha
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreRestoration of rain damages on kandu panjoh ( upper) road km. 0/0 to 3/560(sh construction of pcc retaining wall with pusta at rd 0/910 to 0/925)
Restoration of rain damages on kandu panjoh ( upper) road km. 0/0 to 3/560(sh construction of pcc retaining wall with pusta at rd 0/910 to 0/925)
Read moreConstruction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Construction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Read moreof your Industry type