Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sasci Soil Investigation Vythiri Taluk Hospital Work For Construction Of Multipurpose Building For Inpatients In Vythiri Thaluk Hospital Investigation Work
|
| Description |
Sasci Soil Investigation Vythiri Taluk Hospital Work For Construction Of Multipurpose Building For Inpatients In Vythiri Thaluk Hospital Investigation Work
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_778422_1 |
|
Reference Number |
PWD/BLDG/TR/6481/2025_3_2_1/2 |
| Tender Fee | 555 |
| EMD | 5576 |
| Tender Value | |
| Place | Vythiri, wayanad |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1274454 |
| Start Date | July 22, 2025 18:30 |
| End Date |
Expired
28/07/2025
Expired 366 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreGeneral-soil investigation work for construction of new building for taluk office vythiri-soil investigation work for construction of new building for taluk office vythiri-investigation work
General-soil investigation work for construction of new building for taluk office vythiri-soil investigation work for construction of new building for taluk office vythiri-investigation work
Read moreGeneral-chc pulluvila-construction of multipurpose building for pulluvila hospital soil investigation work
General-chc pulluvila-construction of multipurpose building for pulluvila hospital soil investigation work
Read moreGeneral soil investigation dialysis unit at taluk hospital haripad soil investigation investigation work
General soil investigation dialysis unit at taluk hospital haripad soil investigation investigation work
Read moreGeneral- construction of new building for govt. lps venchembu, punalur taluk- conducting soil investigation work - investigation work
General- construction of new building for&#x0d govt. lps venchembu, punalur taluk-&#x0d conducting soil investigation work -&#x0d investigation work
Read moreGeneral-construction of new building for sidha hospital mangalapuram preliminary soil investigation work
General-construction of new building for sidha hospital mangalapuram preliminary soil investigation work
Read moreGeneral soil investigation for construction of new building for govt high school pathiyoor soil investigation investigation work
General soil investigation for construction of new building for govt high school pathiyoor soil investigation investigation work
Read moreof your Industry type