Tender Details

Particulars Details
Title
Repair / Reconditioning / Rewinding Of 3 Phase Ac Generator / Alternator, 415 V, 35 Kva, 48.7 Amp, 1500 Rpm, Elgi Make, Installed In The Mobile Service Van Of Khadia Project Deployed In Hydraulic Shovels And Surface Miners Section.
Description
Repair / Reconditioning / Rewinding Of 3 Phase Ac Generator / Alternator, 415 V, 35 Kva, 48.7 Amp, 1500 Rpm, Elgi Make, Installed In The Mobile Service Van Of Khadia Project Deployed In Hydraulic Shovels And Surface Miners Section.
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_NCL_319526_1
Reference
Number
KHD/G.M. (Excv)/E-Tender/24-25/585
Tender Fee 0
EMD 700
Tender Value
Place NCL KHADIA PROJECT, SHAKTINAGAR
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331200
Start Date October 22, 2024 15:00
End Date

02/11/2024 ( Expired 216 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing/rewinding of ac generator 35 kva, 3 phase, 415v, 50 hz, sl no. 98e33500-45, make - kirloskar electric installed on tmc (up64 at 2642) at bina project

Repairing/rewinding of ac generator 35 kva, 3 phase, 415v, 50 hz, sl no. 98e33500-45, make - kirloskar electric installed on tmc (up64 at 2642) at bina project

Read more
Complete repairing/rewinding of stator of 90kw, 3 phase, 415 v, 156a, 1483 rpm motor make ngef, local sl. no. 18431002 installed at elecon feeder breaker no. 01 of kdh ocp, nk area

Complete repairing/rewinding of stator of 90kw, 3 phase, 415 v, 156a, 1483 rpm motor make ngef, local sl. no. 18431002 installed at elecon feeder breaker no. 01 of kdh ocp, nk area

Read more
Rewinding of 30kva, a.c generator, kirloskar electric co. make 1500 rpm, 3 phase, amp.41.7, 415 volt, m/c no.90 ah 58-40 of area office of kusunda area

Rewinding of 30kva, a.c generator, kirloskar electric co. make 1500 rpm, 3 phase, amp.41.7, 415 volt, m/c no.90 ah 58-40 of area office of kusunda area

Read more
Changing of propeller shaft center bearing assly, cross flange yoke, assly fuel rail, oil and fuel, air filter etc. work of vehicle no. ka01ad 9782 deployed in hydraulic shovels and surface miners section of khadia project.

Changing of propeller shaft center bearing assly, cross flange yoke, assly fuel rail, oil and fuel, air filter etc. work of vehicle no. ka01ad 9782 deployed in hydraulic shovels and surface miners section of khadia project.

Read more
Repair / reconditioning / rewinding of 3 phase ac generator / alternator, 415 v, 35 kva, 48.7 amp, 1500 rpm, elgi make, installed in the mobile service van of khadia project deployed in hydraulic shovels and surface miners section.

Repair / reconditioning / rewinding of 3 phase ac generator / alternator, 415 v, 35 kva, 48.7 amp, 1500 rpm, elgi make, installed in the mobile service van of khadia project deployed in hydraulic shovels and surface miners section.

Read more
Service overhauling of 415 v ac lt breakers of abb make installed in phase 2 lines along with supply of spares of abb make lt breakers installed in dmrc.

Service overhauling of 415 v ac lt breakers of abb make installed in phase 2 lines along with supply of spares of abb make lt breakers installed in dmrc.

Read more
Supply of 15 kva silent dg comprising of m and m make cpcb iv approved engine model m2155g2 18 bhp ntp 1500 rpm coupled to 15 kva mahindra powerol make 1 phase 230 v 50 hz alternator approved make mounted on a common base frame along with other

Supply of 15 kva silent dg comprising of m and m make cpcb iv approved engine model m2155g2 18 bhp ntp 1500 rpm coupled to 15 kva mahindra powerol make 1 phase 230 v 50 hz alternator approved make mounted on a common base frame along with other

Read more
Offloading the work of repairing /rewinding of alternator cum generator 30kva , 3 phase , 415 v , 50hz for mobile service van (elgi van)of excavation department of krishnashila project.

Offloading the work of repairing /rewinding of alternator cum generator 30kva , 3 phase , 415 v , 50hz for mobile service van (elgi van)of excavation department of krishnashila project.

Read more
Repairing of simpson make welding machine (415 v,3-phase,) fitted in service van of field section workshop at integrated l-b-l ocp

Repairing of simpson make welding machine (415 v,3-phase,) fitted in service van of field section workshop at integrated l-b-l ocp

Read more
Ttps es em iii rewinding of 415 v ac 3 phase 1 2 kw 700 rpm generator transformer cooler fan motors in unit iv and v for the period of one year from the date of commencement of work

Ttps es em iii rewinding of 415 v ac 3 phase 1 2 kw 700 rpm generator transformer cooler fan motors in unit iv and v for the period of one year from the date of commencement of work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise