Tender Details
Particulars | Details |
---|---|
Title |
Providing And Fixing Pressure Reducing Valve On Fire Fighting Pipe Line In Between 3rd Oil Jetty Fire Pump House To Jawahar Tower, Haldia Dock Complex, Haldia
|
Description |
Providing And Fixing Pressure Reducing Valve On Fire Fighting Pipe Line In Between 3rd Oil Jetty Fire Pump House To Jawahar Tower, Haldia Dock Complex, Haldia
|
Organisation | Kolkata Port Trust | Central Govt. Ministry/Department |
Tender Id | 2024_KoPT_838983_1 |
Reference Number |
I and CF/SDM/RZ/ET/118 |
Tender Fee | 590 |
EMD | 8339 |
Tender Value | |
Place | Haldia |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=882184 |
Start Date | December 12, 2024 20:30 |
End Date |
02/01/2025 ( Expired 131 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying and fixing of new dual cell fenders along with ms fender supporting structure and refixing of existing fender facia at bd1 of 3rd oil jetty at haldia dock complex, haldia dock complex, haldia
Supplying and fixing of new dual cell fenders along with ms fender supporting structure and refixing of existing fender facia at bd1 of 3rd oil jetty at haldia dock complex, haldia dock complex, haldia
Read moreSrcc/bnr/pt/010/tnso/2025-26 construction of new fire pump house including pile foundations (offshore) and allied works for re-vamping of fire fighting facilities for oil docks bharati dock-i and bharati dock-iii inside chennai port authority
Srcc/bnr/pt/010/tnso/2025-26 construction of new fire pump house including pile foundations (offshore) and allied works for re-vamping of fire fighting facilities for oil docks bharati dock-i and bharati dock-iii inside chennai port authority
Read moreOperation of pumps including supply of water to vessels and maintenance of fresh water supply and fire fighting line and sanitary works along with other miscellaneous work for a period of one year (2025-2026) inside dock area, hdc, haldia.
Operation of pumps including supply of water to vessels and maintenance of fresh water supply and fire fighting line and sanitary works along with other miscellaneous work for a period of one year (2025-2026) inside dock area, hdc, haldia.
Read moreProviding supply and laying of water supply distribtion fixing of valve and maintenance of pipe line work at municipal all over head tanks, treatment plant pump house and sundea kuppam head work in krishnagiri municiplaity
Providing supply and laying of water supply distribtion fixing of valve and maintenance of pipe line work at municipal all over head tanks, treatment plant pump house and sundea kuppam head work in krishnagiri municiplaity
Read moreJob required for repair replacement 150 mm dia pipe line at kabul line pump house and repair replacement to existing distribution system at age (u) water supply installation in the area of in the area of age (u) water supply no ii under ge (u) water
Job required for repair replacement 150 mm dia pipe line at kabul line pump house and repair replacement to existing distribution system at age (u) water supply installation in the area of in the area of age (u) water supply no ii under ge (u) water
Read moreExe of works required for providing functional house hold tap connection including pipe line work making house hold connection in village rajasani 1 year defect liability period and hand over the system to vwhsc on the risk and cost
Exe of works required for providing functional house hold tap connection including pipe line work making house hold connection in village rajasani 1 year defect liability period and hand over the system to vwhsc on the risk and cost
Read moreReplacement of old sewer line with upgradation of sewer line with 250mm dia pipe line and special repair of road by providing of rmc m-40 grade on the road nearby rahul yadav house in front of km publc school saai in ward no.22 faridabad.
Replacement of old sewer line with upgradation of sewer line with 250mm dia pipe line and special repair of road by providing of rmc m-40 grade on the road nearby rahul yadav house in front of km publc school saai in ward no.22 faridabad.
Read moreContract for providing flat earthing in fire-fighting pylon pipe of ict-1, ict-2 and line reactor and flat earthing of bay name plate board and slogan board at subhasgram s/s
Contract for providing flat earthing in fire-fighting pylon pipe of ict-1, ict-2 and line reactor and flat earthing of bay name plate board and slogan board at subhasgram s/s
Read moreProviding, lowering, laying and jointing water pipe line of at mehta tower side sachin waghmare house to talbhandare house to deva ughade house , solapur.
Providing, lowering, laying and jointing water pipe line of at mehta tower side sachin waghmare house to talbhandare house to deva ughade house , solapur.&#x0d
Read moreRestoration shifting of pipe line including testing and commissioning in between 57 km to 77 km pakage-iii on beripattan jhalas road deposit work
Restoration shifting of pipe line including testing and commissioning in between 57 km to 77 km pakage-iii on beripattan jhalas road deposit work
Read moreof your Industry type