Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
85/2023 24 Panchayath Office Renovation In Asamannoor Gramapanchayath.
|
| Description |
Building Maintenance
|
| Organisation | Government of Kerala |
| Tender Id | 2023_LSGD_582716_1 |
|
Reference Number |
4/AE/LIDEW/ASNR/2023-24 |
| Tender Fee | 1115 |
| EMD | 12604 |
| Tender Value | - |
| Place | Office of the Assistant Engineer,LSGD Section,Asa |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | June 20, 2023 16:30 |
| End Date |
Expired
27/06/2023
Expired 1185 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read more115/2023-24 kallil niravath road renovation in ward 11 asamannoor gramapanchayath
Irish drain
Read more138/2025-26 kudumbasree office renovation in ward 13 asamannoor gramapanchayath
Renovation
Read more90/2023-24 panichayam drinking water project in asamannoor gramapanchayath
Construction of well
Read moreof your Industry type