Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing M30 Grade Concrete For Remaining Portion Of Berth No. 2 Inside Wharf Area
|
| Description |
Providing M30 Grade Concrete For Remaining Portion Of Berth No. 2 Inside Wharf Area
|
| Organisation | New Mangalore Port Trust | Central Govt. Ministry/Department |
| Tender Id | 2024_NMPT_833734_1 |
|
Reference Number |
CIVIL/CE(C)/EE(C)/54/2024-25 |
| Tender Fee | 1120 |
| EMD | 1.96 Lakh |
| Tender Value | - |
| Place | NMPA |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=876232 |
| Start Date | November 20, 2024 15:30 |
| End Date |
Expired
27/11/2024
Expired 691 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing pavement quality concrete around new covered storage shed near kiocl inside wharf
Providing pavement quality concrete around new covered storage shed near kiocl inside wharf
Read moreEzhome gp pro.no 103-2026-27-kuruvad bus stop valanthottam road formation - remaining portion
Ezhome gp pro.no 103-2026-27-kuruvad bus stop valanthottam road formation - remaining portion
Read moreEstimate for the construction of precast boundary wall at remaining portion of dumping ground, hoshiarpur (reso no. 736 (7) datred 25.03.2026)
Estimate for the construction of precast boundary wall at remaining portion of dumping ground, hoshiarpur (reso no. 736 (7) datred 25.03.2026)
Read moreGsb, wmm, interlocking and divider works as part of the remaining works for the one-time improvement and maintenance of old nh-24 (rampur city portion).
Gsb, wmm, interlocking and divider works as part of the remaining works for the one-time improvement and maintenance of old nh-24 (rampur city portion).
Read moreConstruction of an m30-grade cc road in vasundhara colony spanning from kailash nema residence to hanumant singh residence, and from the main gate of kanchan avenue to chhaya duplex garden within cherital ward, under division no. 14.
Construction of an m30-grade cc road in vasundhara colony spanning from kailash nema residence to hanumant singh residence, and from the main gate of kanchan avenue to chhaya duplex garden within cherital ward, under division no. 14.
Read moreConstruction of pending remaining portion of bund / p wall nr. h/o ab. hamid bhat and others at wanigam payeen eid ghah coloney year - 2026 - 27 pyt - wanigam payeen a block - pattan under - cdf hble mla
Construction of pending remaining portion of bund / p wall nr. h/o ab. hamid bhat and others at wanigam payeen eid ghah coloney year - 2026 - 27 pyt - wanigam payeen a block - pattan under - cdf hble mla
Read moreConstruction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (ch. 269.000) telibandha chowk (ch. 268.000) and agrasen chowk (265.500) in raipur city portion of nh-53 at raipur-aurang section in chhattisgarh .
Construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (ch. 269.000) telibandha chowk (ch. 268.000) and agrasen chowk (265.500) in raipur city portion of nh-53 at raipur-aurang section in chhattisgarh .
Read morePrice agreement for manufacturing and supply of fusion welding of rails by alumino thermic process for 60kg / 60 e1 (r-260 grade) rail with nominal gap of 25 mm (atw portion, 3 piece moulds, single shot crucible, luting sand/paste and igniter) spec: (rdso) irs t -19-2021 with acs 1 and acs 2
Price agreement for manufacturing and supply of fusion welding of rails by alumino thermic process for 60kg / 60 e1 (r-260 grade) rail with nominal gap of 25 mm (atw portion, 3 piece moulds, single shot crucible, luting sand/paste and igniter) spec: (rdso) irs t -19-2021 with acs 1 and acs 2
Read moreReducing nipple of size 1/2 x 3/8 bsp threading (parallel) on both sides, total length - 40mm; 1/2 threaded length -15 mm; 3/8 threaded length-15mm, hex. head thickness-10mm, width af27mm, 3/8 ends inside should have tapered profile (cone type). material: carbon steel astm-a108 & grade a1018 with zinc coated. note: material should be machined from forged planks & not to be casted.
Reducing nipple of size 1/2 x 3/8 bsp threading (parallel) on both sides, total length - 40mm; 1/2 threaded length -15 mm; 3/8 threaded length-15mm, hex. head thickness-10mm, width af27mm, 3/8 ends inside should have tapered profile (cone type). material: carbon steel astm-a108 & grade a1018 with zinc coated. note: material should be machined from forged planks & not to be casted.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type