Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shahbad Town Dpr For Prov. And Installing 3 Nos. Additional Tw, Replacement Of Existing Ac/Pvc Pipeline, Pumping Machinery, Laying Of Newly Di Pipeline Etc. In Shahbad Town
|
Description |
Dnit For Laying Of Di Pipeline, Construction Of 3 Nos. Pump Chamber, Providing Fhtc, Replacement Of Pumping Machinery, Providing And Fixing Water Meter In Shahbad Town Distt. Kurukshetra And All Other Works Contingent Thereto
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_444222_1 |
Reference Number |
202599D894A4 630F 43BD A6AF F152FFB91B92596PUH |
Tender Fee | 16180 |
EMD | 4.08 Lakh |
Tender Value | |
Place | Shahbad |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=521647 |
Start Date | May 01, 2025 23:30 |
End Date |
13/05/2025 ( Expired 53 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Read moreTtps es circle em i retrofitting of 3 nos lt acb edo 3 pole 3200 amps breakers with retrofit kit for replacement of the existing breakers in unit i ii and iii 6 6kv control room
Ttps es circle em i retrofitting of 3 nos lt acb edo 3 pole 3200 amps breakers with retrofit kit for replacement of the existing breakers in unit i ii and iii 6 6kv control room
Read moreInstallation of new tubewell at wss suron block shambhu kalan
Providing and installing new tubewell 250mm x200mm i/d upto 350mtr. depth, pumping machinery and rising main etc. at water supply scheme village suron (2 nos.), block shambhu kalan
Read moreConstruction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Construction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Read moreInstallation of tubewell at water supply scheme roran wali urf tarre wala block jalalabad distt. fazilka (under pidb 4215)
Boring and installing of tubewell 200 mm dia pvc straight tubewell 200 mtr., providing, laying, cutting, jointing, testing of pvc pipe 10 kg cm2 for rising main, pumping machinery and all other works contingent thereto.
Read moreInstallation of two nos of screw chillers in ac system in place of existing vam units 3 and 4 at apcpl
Installation of two nos of screw chillers in ac system in place of existing vam units 3 and 4 at apcpl
Read moreSpecial repair maintenance required for extention of 3 phase line in block 1 at new secretariat building agartala for installation of eleven nos 4 tr vertical ac machines in ga p and t law dept home dept and in lounge attached with conference hall
Special repair maintenance required for extention of 3 phase line in block 1 at new secretariat building agartala for installation of eleven nos 4 tr vertical ac machines in ga p and t law dept home dept and in lounge attached with conference hall
Read moreExtension and replacement of damaged pipeline and laying of di pipeline due to widening of nh-31 (falakata to salsalabari ) at uttar sonapur and adjacent areas for dakshin sonapur pwss, alipurduar-i block under alipurduar division, phe dte.
Extension and replacement of damaged pipeline and laying of di pipeline due to widening of nh-31 (falakata to salsalabari ) at uttar sonapur and adjacent areas for dakshin sonapur pwss,&#x0d alipurduar-i block under alipurduar division, phe dte.&#x0d
Read more2 nos non clog motor
Providing installing testing and commissioning of 2 nos non clog horizontal pumping complete in all respect including panels soft starters cabling etc and high mast lights for stp campus at 95 mld stp north zone located at village gausabad distri
Read moreRenovation upgradation special repair to existing ei in guest house b block, (room nos. 4,5,6,7,8,9,10,11 and 12 situed at first, second and third floor) at mgsipa pb, sec-26, chd (replacement of ei, lamps tubes, fan and light fittings etc.)
Renovation upgradation special repair to existing ei in guest house b block, (room nos. 4,5,6,7,8,9,10,11 and 12 situed at first, second and third floor) at mgsipa pb, sec-26, chd (replacement of ei, lamps tubes, fan and light fittings etc.)
Read moreof your Industry type