Tender Details
Particulars | Details |
---|---|
Title |
Development Of Borewell With Air Compressor And Pumping Set Of Suitable Rating For Restoration From Muddy And Silt Water At T Well No. M 24 In Sec 5 Panchkula
|
Description |
Development Of Borewell With Air Compressor And Pumping Set Of Suitable Rating For Restoration From Muddy And Silt Water At T Well No. M 24 In Sec 5 Panchkula
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2025_HBC_432281_1 |
Reference Number |
20252124303A 5B65 4CC0 8CFE CB452BAC7183269HSV |
Tender Fee | 1430 |
EMD | 3400 |
Tender Value | |
Place | Panchkula |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509353 |
Start Date | March 07, 2025 22:45 |
End Date |
17/03/2025 ( Expired 56 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge af no.1/gur-15/2025-26 repair and maintenance of chlorination system, centrifugal pumping set, yield development, sumersible pumping set, repair of borewell line other connected works for water supply installations at afstation gurgaon un
Ca no. ge af no.1/gur-15/2025-26 repair and maintenance of chlorination system, centrifugal pumping set, yield development, sumersible pumping set, repair of borewell line other connected works for water supply installations at afstation gurgaon un
Read moreFor eoi request for proposal (rfp) for installation and upgradation of city cctv surveillance (with 5 years o and m) in gwalior, madhya pradesh
For emd request for proposal (rfp) for installation and upgradation of city cctv surveillance (with 5 years o and m) in gwalior, madhya pradesh.
Read moreSurvey design fabrication supply installation testing commissioning of on-grid srt project with net meter and rms of 355 kw at various 24 govt/ semi govt offices buildings in satara district of maharashtra with cmc for 5 years
Survey design fabrication supply installation testing commissioning of on-grid srt project with net meter and rms of 355 kw at various 24 govt/ semi govt offices buildings in satara district of maharashtra with cmc for 5 years
Read more3rd and final call for rejuvenation of water body at baduria dighi in ward no.- 5 under baduria municipality under amrut 2.0
3rd and final call for rejuvenation of water body at baduria dighi in ward no.- 5 under baduria municipality under amrut 2.0
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Read moreSelection of consultancy firm for planning and designing of town planning scheme (tps no 5, 6 and 7) under zone 1 of proposed bda town planning schemes in bhubaneswar development plan area bdpa
Selection of consultancy firm for planning and designing of town planning scheme (tps no 5, 6 and 7) under zone 1 of proposed bda town planning schemes in bhubaneswar development plan area bdpa
Read moreProvn of connecting road from 5 afsb permanent location to 19 wing, provn of misc br works, false flooring in room of cpss building, weather shed for garage and top cover of static water tank at 5 afsb under ge (af) borjhar
Provn of connecting road from 5 afsb permanent location to 19 wing, provn of misc br works, false flooring in room of cpss building, weather shed for garage and top cover of static water tank at 5 afsb under ge (af) borjhar
Read moreWater supply schemes in tripura /sh- re-development of old serviceable dtw with contractors air compressor (300-450 cfm, 150 psi) in different places under rig sub-division no-i, badharghat during the year 2025-26
Water supply schemes in tripura /sh- re-development of old serviceable dtw with contractors air compressor (300-450 cfm, 150 psi) in different places under rig sub-division no-i, badharghat during the year 2025-26
Read moreE.l.d.c no/s.m.ii /p3/1628/ 2025 supply and commissioning of 2 nos of 25 kva diesel generator with camc for a period of 5 years after one year warranty period for 2 nos of chennai high and higher secondary schools in gcc zone 12
E.l.d.c no/s.m.ii /p3/1628/ 2025 supply and commissioning of 2 nos of 25 kva diesel generator with camc for a period of 5 years after one year warranty period for 2 nos of chennai high and higher secondary schools in gcc zone 12
Read moreE.l.d.c no/s.m.ii/p1/ 1620/ 2025 supply installation commissioning of 1no of 58.5 kva diesel generator with comprehensive annual maintenance contract for a period of 5 years after one year warranty period for 1no. chennai hr sec school gcc zon 3
Supply installation commissioning of 1no of 58.5 kva diesel generator with comprehensive annual maintenance contract for a period of 5 years after one year warranty period for 1no. of chennai higher secondary schools in gcc zone 3
Read moreof your Industry type