Tender Details

Particulars Details
Title
Supplying, Stacking, Loading And Unloading Of Quarry Dust At Guna Siding For Monsoon Reserve Under Aden Guna Sub Division.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 76196766
Reference
Number
WCR-BPL-W-24-25-N-09-38
Tender Fee 0
EMD 40700
Tender Value
Place Jabalpur
Link https://www.ireps.gov.in/ireps/works/pdfdocs/072024/76196766/viewNitPdf_4639443.pdf
Start Date July 12, 2024 22:00
End Date

26/07/2024 ( Expired 296 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Provn of klp accn for stn hq and ci det swc at suratgarh mil stn under ge (army) suratgarh

Provn of klp accn for stn hq and ci det swc at suratgarh mil stn under ge (army) suratgarh

Read more
Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.

Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.

Read more
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).

Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).

Read more
Supply, installation, testing and commissioning of table-top afm/stm system for ambient operation with vibration isolation stage and advanced imaging options

Supply,&amp#x0d installation, testing and commissioning of table-top afm/stm system for ambient operation with&amp#x0d vibration isolation stage and advanced imaging options at the department of physics, kannur university (under pm usha scheme)

Read more
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of various 132 kv ehv lines under tlm sub dn. itarsi under administrative control of ee (eht-maint.) dn. itarsi

For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of various 132 kv ehv lines under tlm sub dn. itarsi under administrative control of ee (eht-maint.) dn. itarsi

Read more
S.i.t.c of central air conditioning system

Construction of cancer care centers at north bengal medical college and hospital siliguri under north bengal construction division s.i.t.c of central air conditioning system

Read more
Civil m and r works at 220 kv sub station anandnagar maharajganj under jurisdiction of electricity transmission circle gorakhpur

Civil m and r works at 220 kv sub station anandnagar maharajganj under jurisdiction of electricity transmission circle gorakhpur

Read more
Providing of vibration dampers and arcing horns for 132 kv koilsagar-khanapur line from loc.no.79 to 146 in jurala lines sub division in mahabubnagar circle.

Providing of vibration dampers and arcing horns for 132 kv koilsagar-khanapur line from loc.no.79 to 146 in jurala lines sub division in mahabubnagar circle

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise