Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication And Erection Of Rake Assembly (Both Arms) And Its Supporting Structure After Complete Dismantling Of Old And Damaged Rake Assembly Of Thickener No. 01 At Kathara Washery
|
| Description |
Fabrication And Erection Of Rake Assembly (Both Arms) And Its Supporting Structure After Complete Dismantling Of Old And Damaged Rake Assembly Of Thickener No. 01 At Kathara Washery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_314787_1 |
|
Reference Number |
PO/KTW/EnM/eTen/24-25/96 Dated-09.08.2024 |
| Tender Fee | 0 |
| EMD | 9700 |
| Tender Value | - |
| Place | Kathara Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326229 |
| Start Date | August 10, 2024 16:30 |
| End Date |
Expired
20/08/2024
Expired 788 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling of old under carriage assembly and fitting of under carriage assembly partial in hydraulic shovel machine be10253 after dismantling from grounded shovel be10123 by support by hydraulic jack at adic kusunda area
Dismantling of old under carriage assembly and fitting of under carriage assembly partial in hydraulic shovel machine be10253 after dismantling from grounded shovel be10123 by support by hydraulic jack at adic kusunda area
Read moreSet of control arms (finished) for lhb bogies as per rcf planning list no:- mplgconfinlhb, version 5 (document attached with this tender). packing instructions:- (1) each control arm upper to drg.no-1277122 and control arm lower left to drg.no- 1267716 to be assembled after machining with the help of pvc screws. (2) each control arm upper to drg.no-1277122 and control arm lower right to drg.no-1267717 to be assembled after machining with the help of pvc screws. (3) assembly of (upper and lower
Set of control arms (finished) for lhb bogies as per rcf planning list no:- mplgconfinlhb, version 5 (document attached with this tender). packing instructions:- (1) each control arm upper to drg.no-1277122 and control arm lower left to drg.no- 1267716 to be assembled after machining with the help of pvc screws. (2) each control arm upper to drg.no-1277122 and control arm lower right to drg.no-1267717 to be assembled after machining with the help of pvc screws. (3) assembly of (upper and lower
Read moreTaking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Read moreFabrication and erection of rake assembly (both arms) and its supporting structure after complete dismantling of old and damaged rake assembly of thickener no. 01 at kathara washery
Fabrication and erection of rake assembly (both arms) and its supporting structure after complete dismantling of old and damaged rake assembly of thickener no. 01 at kathara washery
Read moreA) repairing of rake arms assembly, centre cage assembly, skew arms, scrapper blades, centre scrapper, centre pin, adjusting pin etc. at thickener no. il in fine coal section of kathara washery b) repairing, making and fixing of circular launder perf
A) repairing of rake arms assembly, centre cage assembly, skew arms, scrapper blades, centre scrapper, centre pin, adjusting pin etc. at thickener no. il in fine coal section of kathara washery b) repairing, making and fixing of circular launder perf
Read moreDismantling and changing worn-out feed launder along with repairing/ changing of walkway, walkway support structure, rake arms etc. of thickener no.1 of moonidih coal washery.
Dismantling and changing worn-out feed launder along with repairing/ changing of walkway, walkway support structure, rake arms etc. of thickener no.1 of moonidih coal washery.
Read moreDi of pipeline for water supply along with kathara colliery and kathara washery store thickener to p.o office under kathara washery
Di of pipeline for water supply along with kathara colliery and kathara washery store thickener to p.o office under kathara washery
Read moreRepairing of radial thickener assembly of thickener no. i and 02 nos. vertical shaft of gear box assembly of thickener no. i and ii of fine col section at kathara washery
Repairing of radial thickener assembly of thickener no. i and 02 nos. vertical shaft of gear box assembly of thickener no. i and ii of fine col section at kathara washery
Read moreRepair work of conical thickener rake assembly in crp
Repair work of conical thickener rake assembly in crp at travancore titanium products ltd, trivandrum- 695021
Read moreDismantling the existing old and damaged and fabrication and erection of complete circular launder along with its supporting structure of thickener no. 01 in sec-i of fine coal section of kathara washery
Dismantling the existing old and damaged and fabrication and erection of complete circular launder along with its supporting structure of thickener no. 01 in sec-i of fine coal section of kathara washery
Read moreof your Industry type